My WebLink
|
Help
|
About
|
Sign Out
Home
2016-04-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-04-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 9:17:57 AM
Creation date
4/22/2016 9:02:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/26/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 38 <br /> Permit No: MNR040000 <br /> b. Site plan review <br /> The program shall include written procedures for site plan reviews conducted by the <br /> permittee prior to the start of construction activity, to ensure compliance with <br /> requirements of the Regulatory Mechanism(s).The site plan review procedure shall <br /> include notification to owners and operators proposing construction activity of the <br /> need to apply for and obtain coverage under the Agency's general permit to Discharge <br /> Storm water Associated with Construction Activity No.MN R100001. <br /> c. Public input <br /> The program shall include written procedures for receipt and consideration of reports of <br /> noncompliance or other stormwater related information on construction activity <br /> submitted by the public to the permittee. <br /> d. Site inspections <br /> The program shall include written procedures for conducting site inspections, to <br /> determine compliance with the permittee's Regulatory Mechanism(s).The written <br /> procedures shall: <br /> (1) Include procedures for identifying priority sites for inspection. Prioritization can be <br /> based on such parameters as topography, soil characteristics, type of receiving <br /> water(s), stage of construction, compliance history, weather conditions, or other <br /> local characteristics and issues. <br /> (2) Identify frequency at which site inspections will be conducted <br /> (3) Identify name(s) of individual(s) or position titles responsible for conducting site <br /> inspections <br /> (4) Include a checklist or other written means to document site inspections when <br /> determining compliance. <br /> e. ERPs required by Part 111.13 of this permit <br /> f. Documentation of the following information: <br /> (1) For each site plan review—The project name, location, total acreage to be <br /> disturbed, owner and operator of the proposed construction activity, and any <br /> stormwater related comments and supporting documentation used by the <br /> permittee to determine project approval or denial. <br /> (2) For each site inspection - Inspection checklists or other written means used to <br /> document site inspections <br />
The URL can be used to link to this page
Your browser does not support the video tag.