Laserfiche WebLink
Page 31 of 38 <br /> Permit No: MNR040000 <br /> Table 2 <br /> Existing Permittees—Schedule of Permit Requirements <br /> Permit Requirement Schedule <br /> PART II.APPLICATION REQUIREMENTS <br /> • Submit Part 2 of the permit application with the SWPPP • See Table 1 above. <br /> document completed in accordance with Part 11.D. <br /> PART III.STORMWATER POLLUTION PREVENTION <br /> PROGRAM(SWPPP) <br /> • Complete revisions to incorporate requirements of Part • Within 12 months of the date permit coverage is <br /> 111.A-F into current SWPPP. extended, unless other timelines have been <br /> specifically established in this permit and identified <br /> Part III.0 Mapping and Inventory below. <br /> Part III.C.2 Inventory <br /> • Complete and submit inventory in accordance with Part • Within 12 months of the date permit coverage is <br /> 111.C.2. extended. <br /> Part III.D.6 Pollution Prevention/Good Housekeeping For <br /> Municipal Operations <br /> Part III.D.6.e Inspections <br /> • Conduct inspections. • Annually(Part III.D.6.e(1)and (2)),Quarterly(Part <br /> III.D.6.e(3)). <br /> Part IILE Impaired Waters and TMDLs(if applicable) <br /> • Submit all information required by Part III.E. • With each Annual Report required in Part IV.B. <br /> Part I II.F.Alum or Ferric Chloride Phosphorus Treatment <br /> Systems(if applicable) <br /> • Meet requirements for treatment systems under Part • Within 12 months of the date permit coverage is <br /> III.F. extended. <br /> PART IV. ANNUAL SWPPP ASSESSMENT,ANNUAL <br /> REPORTING AND RECORD KEEPING <br /> Part IV.A Annual SWPPP Assessment <br /> • Conduct assessment of the SWPPP. • Annually and prior to completion of each Annual <br /> Report. <br /> Part IV.B Annual Reporting <br /> • Submit an Annual Report • By June 301h of each calendar year. <br /> Table 3 <br /> New Permittees—Schedule of Permit Requirements <br /> Permit Requirement Schedule <br /> PART II.APPLICATION REQUIREMENTS <br /> • Submit Part 1, and Part 2 of the permit application with • Within 18 months of written notification from the <br /> the proposed SWPPP document as required by Part 11.D. Commissioner that the MS4 meets the criteria in <br /> Minn. R.7090.1010,Subpart 1.A.or B.and permit <br /> coverage is required. <br /> PART III.STORMWATER POLLUTION PREVENTION <br /> PROGRAM(SWPPP) <br /> • Complete all requirements of Part 111.A-F. • Within 36 months of the date permit coverage is <br /> extended, unless other timelines have been <br /> specifically established in this permit and identified <br /> below;or <br /> • Within timelines established by the Commissioner <br /> Part III.A Regulatory Mechanism(s) under Part I.F.2. <br /> Illicit Discharge Detection and Elimination <br /> (see Part III.D.3) <br />