Laserfiche WebLink
Page 32 of 38 <br /> Permit No: MNR040000 <br /> • Develop, implement, and enforce Regulatory Mechanism. • Within 12 months of the date permit coverage is <br /> extended. <br /> Construction Site Stormwater Runoff Control <br /> (see Part III.D.4) <br /> • Develop, implement, and enforce Regulatory Mechanism. • Within six(6) months of the date permit coverage is <br /> extended. <br /> Post-Construction Stormwater Management <br /> (see Part III.D.S) <br /> • Develop, implement, and enforce Regulatory Mechanism. • Within 24 months of the date permit coverage is <br /> extended. <br /> Part 111.13 Enforcement Response Procedures(ERPs) <br /> • Develop and implement written ERPs for the Regulatory • Within 24 months of the date permit coverage is <br /> Mechanism(s)required under Part III.A. extended. <br /> Part III.0 Mapping and Inventory <br /> Part III.C.1 Mapping <br /> • Develop a storm sewer system map. • Within 24 months of the date permit coverage is <br /> extended. <br /> Part III.C.2 Inventory <br /> • Complete and submit inventory in accordance with Part • Within 24 months of the date permit coverage is <br /> III.C.2. extended. <br /> Part IIID Minimum Control Measures <br /> Part III.D.4 Construction Site Stormwater Runoff Control <br /> • Develop, implement, and enforce a Construction Site • Within six(6) months of the date permit coverage is <br /> Stormwater Runoff Control program. extended.See Part III.A Regulatory Mechanism(s). <br /> Part III.D.S Post-Construction Stormwater Management <br /> • Develop, implement, and enforce a Post-Construction • Within 24 months of the date permit coverage is <br /> Stormwater Management program. extended.See Part III.A Regulatory Mechanism(s). <br /> Part III.D.6 Pollution Prevention/Good Housekeeping for <br /> Municipal Operations <br /> Part III.D.6.e Inspections <br /> • Conduct inspections. • Annually(Part III.D.6.e(1)and (2)),Quarterly(Part <br /> III.D.6.e(3)). <br /> Part IILE Impaired Waters and TMlDLs(if applicable) <br /> • Submit all information required by Part III.E. • With each Annual Report required in Part IV.B. <br /> Part I II.F.Alum or Ferric Chloride Phosphorus Treatment <br /> Systems(if applicable) <br /> • Meet requirements for treatment systems under Part • Within 12 months of the date permit coverage is <br /> III.F. extended. <br /> PART IV. ANNUAL SWPPP ASSESSMENT,ANNUAL <br /> REPORTING AND RECORD KEEPING <br /> Part IV.A Annual SWPPP Assessment <br /> • Conduct assessment of the SWPPP. • Annually and prior to completion of each Annual <br /> Report. <br /> Part IV.B Annual Reporting <br /> • Submit an Annual Report. • By June 301h of each calendar year. <br />