My WebLink
|
Help
|
About
|
Sign Out
Home
2016-04-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-04-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 9:17:57 AM
Creation date
4/22/2016 9:02:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/26/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
care, native plantings, rain water gardens, etc. <br /> Review current information available through the City Web Page <br /> City Web Pae each year. Track hits to web a e annually. <br /> BMP categories to be implemented Measurable goals and timeframes <br /> 3. Provide the name or the position title of the individual(s)who is responsible for implementing and/or coordinating this <br /> MCM: <br /> MS4 Permit Coordinator <br /> B. MCM2: Public participation and involvement <br /> 1. The Permit(Part III.D.2.a.)requires that,within 12 months of the date permit coverage is extended, existing permittees <br /> shall revise their current program, as necessary, and continue to implement a public participation/involvement program to <br /> solicit public input on the SWPPP. Describe your current program: <br /> B.1. The Annual Public SWPPP meeting includes an educational component. The City will notify the public 30 days prior <br /> to the annual meeting. The notice will refer to the SWPPP as being a topic of discussion at the meeting and will inform <br /> people on the location, date and time or the public meeting. The notice will also inform the public on where they may view <br /> a copy of the SWPPP and that they have an opportunity to comment on the SWPPP. Following the public meeting, all <br /> relevant material discussed concerning the SWPPP will be submitted with the annual report. <br /> 2. List the categories of BMPs that address your public participation/involvement program, including solicitation and documentation <br /> of public input on the SWPPP. Use the first table for categories of BMPs that you have established and the second table for <br /> categories of BMPs that you plan to implement over the course of the permit term. <br /> Include the measurable goals with appropriate timeframes that each BMP category will be implemented and completed. In <br /> addition, provide interim milestones and the frequency of action in which the permittee will implement and/or maintain the BMPs. <br /> Refer to the EPA's Measurable Goals Guidance for Phase 11 Small MS4s(Lqg://www.epa.Aov/niDdes/ioubs/measurablegoals.pdn. <br /> If you have more than five categories, hit the tab key after the last line to generate a new row. <br /> Established BMP categories Measurable goals and timeframes <br /> Annually, meet notice requirement of at least 30 days prior to <br /> Comply with Public Notice Requirements meeting <br /> Solicit Public Input and opinions on the Adequacy of SWPPP is available at the meeting and public is given option to <br /> the SWPPP provide input at the annual meeting <br /> Conduct public hearing for each permit year Public Hearing is held annually in about May or June <br /> Any public comments are reviewed by staff prior to completing <br /> Review and consider public Input the annual report <br /> Local resident participation events(e.g.,Adopt-a-park, Continue annual events. Track number of events held each <br /> spring and fall clean up, storm stenciling) year. <br /> BMP categories to be implemented Measurablegoals and timeframes <br /> 3. Do you have a process for receiving and documenting citizen input? ❑Yes ® No <br /> If you answered no to the above permit requirement, describe the tasks and corresponding schedules that will be taken to <br /> assure that, within 12 months of the date permit coverage is extended, this permit requirement is met: <br /> 8.3. The City currently solicits input and opinions from the public. This input is gathered and documented in our MS4 <br /> program. The City also tracks calls from the public on drainage issues and concerns in its asset management system. <br /> However the City plans to review current practices to ensure they are in a written format and housed so they are easy to <br /> find. This effort will be completed within 12 months of the date permit coverage is extended. <br /> 4. Provide the name or the position title of the individual(s)who is responsible for implementing and/or coordinating this <br /> MCM: <br /> MS4 Permit Coordinator <br /> C. MCM 3: Illicit discharge detection and elimination <br /> www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br /> wq-strm4-49a • 5131113 Page 9 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.