Laserfiche WebLink
3. List the categories of BMPs that address your construction site stormwater runoff control program. Use the first <br /> table for categories of BMPs that you have established and the second table for categories of BMPs that you plan <br /> to implement over the course of the permit term. <br /> Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br /> completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br /> and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase II Small MS4s <br /> (htt_p://www.epa.gov/npdes/pubs/measurablegoals.pdf). If you have more than five categories, hit the tab key <br /> after the last line to generate a new row. <br /> Established BMP categories Measurable goals and timeframes <br /> Process/review all applications for compliance with stormwater <br /> Permit Application System standards <br /> Inspections by City staff are conducted weekly and following <br /> Inspections rainfall events exceeding 'h-inch <br /> BMP categories to be implemented Measurable goals and timeframes <br /> Develop and maintain written procedures for erosion <br /> control development review and construction site Create within 12 months of permit authorization, update annually <br /> inspection program as needed <br /> 4. Provide the name or the position title of the individual(s)who is responsible for implementing and/or coordinating this <br /> MCM: <br /> MS4 Permit Coordinator <br /> E. MCM 5: Post-construction stormwater management <br /> 1. The Permit(Part III.D.5.)requires that, within 12 months of the date permit coverage is extended, existing permittees <br /> shall revise their current program, as necessary, and continue to implement and enforce a post-construction stormwater <br /> management program. Describe your current program: <br /> E.1. The City has a Stormwater Ordinance and Standards that establishes the required use of BMPs for rate control and <br /> water quality for new and redevelopment projects.As new developments and redevelopments come in for permit staff <br /> reviews them to ensure that they comply with the goals and policies included in the City's comprehensive surface water <br /> management plan. Green infrastructure BMPs such as rain gardens, infiltration trenches, biofiltration trenches, vegetated <br /> swales, etc. are encouraged to be installed to manage post-construction runoff.. <br /> 2. Have you established written procedures for site plan reviews that you will conduct prior to the start of ®Yes ❑ No <br /> construction activity? <br /> 3. Answer yes or no to indicate whether you have the following listed procedures for documentation of <br /> post-construction stormwater management according to the specifications of Permit(Part III.D.5.c.): <br /> a. Any supporting documentation that you use to determine compliance with the Permit(Part ®Yes ❑ No <br /> III.D.5.a), including the project name, location,owner and operator of the construction activity, any <br /> checklists used for conducting site plan reviews, and any calculations used to determine <br /> compliance? <br /> b. All supporting documentation associated with mitigation projects that you authorize? ❑Yes ® No <br /> c. Payments received and used in accordance with Permit(Part III.D.5.a.(4)(f))? ❑Yes ® No <br /> d. All legal mechanisms drafted in accordance with the Permit(Part III.D.5.a.(5)), including date(s)of ❑Yes ® No <br /> the agreement(s)and names of all responsible parties involved? <br /> If you answered no to any of the above permit requirements, describe the steps that will be taken to assure that,within <br /> 12 months of the date permit coverage is extended, these permit requirements are met. <br /> E.3. The City will reivew and update current documentation of post-construction stormwater management according <br /> to the Permit(Part III.D.5.c). This effort will be completed within 12 months of the date permit coverage is extended. <br /> 4. List the categories of BMPs that address your post-construction stormwater management program. Use the first table <br /> for categories of BMPs that you have established and the second table for categories of BMPs that you plan to <br /> implement over the course of the permit term. <br /> Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br /> completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br /> and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase II Small MS4s <br /> (http://www.epa.gov/npdes/pubs/measurablegoals.pdf). If you have more than five categories, hit the tab key after <br /> the last line to generate a new row. <br /> www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br /> wq-strm4-49a • 5131113 Page 12 of 15 <br />