My WebLink
|
Help
|
About
|
Sign Out
Home
2016-02-03_PC_Agenda_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Agendas and Packets
>
2016 Agendas
>
2016-02-03_PC_Agenda_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 11:46:07 AM
Creation date
4/22/2016 11:45:58 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Agenda/Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />City of Roseville <br />2-3-16 <br />Page 2 <br />making on what is an acceptable PUD. We have identified a number of potential <br />over-arching goals the City would like to accomplish with these types of projects. <br />(B) Initiation of Proceedings <br /> – Rather than reinvent the wheel, we simply followed <br />standard language used throughout the Roseville ordinance to explain how the PUD <br />process can be initiated. <br />(C) Reflection on the Official Zoning Map <br /> – As recommended, we have crafted the <br />language in this section to adopt PUD’s via an overlay district rather than as a stand- <br />alone zoning district. This ensures that underlying zoning standards will still be <br />applicable unless specifically amended by the overlay district. Approaching PUDs <br />this way ensures that the City will be protected if any details are missed during the <br />development review process. <br />(D) Permitted Locations for PUD rezoning <br /> – As requested, PUDs would be allowed <br />for all types of development in all districts under this draft language. <br />(E) PUD Qualifications <br />– We are recommending that any land proposed to develop as <br />a PUD be under single ownership, or if under multi-party control, be required to <br />provide “legally sufficient written consent” from all persons and entities with <br />ownership interest. Additionally, we are recommending that PUDs be a minimum of <br />two (2) acres in size unless it can be demonstrated that a project of superior design <br />can be achieved or that greater compliance with the comprehensive plan goals and <br />policies can be attained through use of the PUD process on a smaller parcel. <br />(F) Permitted Uses within a PUD <br /> – In this section, we restrict uses to those that are <br />allowed by underlying zoning, but leave the door open for new uses if the <br />Community Development Department deems that such a new use is “substantially <br />similar” to an allowed use. This ensures that new industries seeking a home in <br />Roseville could potentially do so via PUD even if their specific use isn’t defined in <br />code. Also addressed is the specialization of uses within a PUD. Whereas <br />subdivision (a) states that uses will be limited to those allowed by underlying zoning, <br />subdivision (b) grants the City flexibility to tailor use restrictions to the PUD site and <br />surroundings. For example, current Roseville codes state that "no commercial <br />transactions" can occur at a mini-storage facility. This provision could potentially <br />allow someone to propose a mini-storage facility that includes a management office, <br />sale of boxes and moving equipment, etc. The “use” hasn’t changed, but the <br />general regulations governing the use were tailored specifically for the site. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.