My WebLink
|
Help
|
About
|
Sign Out
Home
Variance Board Resolution 98
Roseville
>
Commissions, Watershed District and HRA
>
Variance Board
>
Resolutions
>
Variance Board Resolution 98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 9:06:55 AM
Creation date
5/13/2016 1:27:32 PM
Metadata
Fields
Template:
Roseville General
Roseville General - Department
Community Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
limitation (which has nat been review°�d for patential revisian since its ori�inal <br />adoption in 1996) may not be adequate to accommodate the current and future <br />�enerations of tnore potiverful telecommunication equipment; <br />d. The praposed telecommunication support building makes reasonak�le use of the <br />subjeet praperty because it facilitates eo-Location of telecomrnunication services at an <br />existing faci�ity; <br />e. The requested variance p�rtains to the size of the proposed support btiilding, which qs <br />the sarne size as would be proposed in any location, anti is therefore unrelated to the <br />�vhether the subject property is constrained b} uni�ue circurnstances; and <br />While the proposed tel�ecommunication support building would be larger than tivhat <br />wauld be allowed under the standard zoning req�irements, apgroval of the requested <br />varian�e wou�d not negati�ely alter the character of ihe telecomm�nication tower <br />facility within City Hail Campus because the propased building would be lacated at <br />an exlsting telecommunication co`n+er facility and mu5t be designed to a significantly <br />higher aesthetic standarci than any of the previous installations already on site. <br />NOW �'HEREFORE BE IT RESOLVED, by the Roseville Variance Baard, to approve <br />the requested variance to the construction of a 322-square-foot telecomr��unication support <br />buildin�; as pra�osed. <br />The motion for the adaption of the foregoing resolutian was duly s�concied by Varianc� <br />Board Mernber Cunningharn and upon vate being taken thereon, the foliowing voted in favor: <br />Bo�uszewski, Cunningham, and Murphy; <br />and none voted against; <br />WHEREUPQN said resolution w�s declared duly passed and adopted. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.