My WebLink
|
Help
|
About
|
Sign Out
Home
2016-05-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-05-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 4:24:58 PM
Creation date
5/19/2016 4:24:11 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br /> Transportation Commission <br /> Agenda Item <br /> Date: May 24, 2016 Item No: 5 <br /> Item Description: Communication Items <br /> Public Works Project updates: <br /> • Twin Lakes Parkway <br /> • Extension of Twin Lakes Parkway from Prior Ave to Fairview Ave. <br /> • Crews have begun removing trees and existing pavement for the new road <br /> alignment. <br /> • Starting week of April 25, crews will begin installing watermain. <br /> ■ Fairview Avenue at Terrace Avenue will be closed April 25 & 26 for a <br /> water main connection. <br /> • 35W & Cleveland Interchange <br /> • Improved intersection improvements at 35W and Cleveland Avenue. <br /> • Major work is ongoing on the northbound lanes. <br /> ■ Retaining wall, storm sewer, and curb and gutter have been installed on <br /> the north bound lanes <br /> ■ Week of May 23 paving northbound lanes. <br /> ■ Traffic shift beginning Week of May 31. Ramps to and from northbound <br /> 35W will be closed for 3-4 weeks to reconstruct southbound lanes. <br /> • Capital Region—Upper Villa Reuse and Infiltration Project <br /> ■ All work on the project is completed other than sod replacement in the <br /> outfield which will occur in the fall. <br /> ■ The infiltration and reuse system is in full use. <br /> • 2016 Sewer Lining Project <br /> • The contractor, Insituform, has completed 90% of the lining work and should be <br /> done by June 15. <br /> • 2016 Pavement Management Project <br /> • City's annual mill and overlay project. This year approximately 7 miles of roads <br /> will be repaved <br /> ■ Work on Sherren, Shryer, Ryan, Wilder and Sharondale should be <br /> completed by next week. <br /> • Heinel Watermain Lining Project <br /> • Project is scheduled to be awarded on June 13. <br /> • Cleveland Lift Station <br /> • Lift station replacement project at Cleveland & Brenner. <br /> • Staff s working with Bolten-Meek on design. Construction late fall or early spring <br /> of 2017. <br /> 0 Twin Lakes Area East Collector <br />
The URL can be used to link to this page
Your browser does not support the video tag.