Laserfiche WebLink
5/19/2016 M S4 Annual Report for 2015 <br /> Q56 Enter the number of site inspections conducted for sites an acre or greater <br /> between January 1 , 2015 and December 31 , 2015: <br /> 58 <br /> Q57 Enter the frequency at which site inspections are conducted (e.g. daily, weekly, <br /> monthly): [Part III.D.4.d.(2)] <br /> [weekly and or after a 0 .5" rainfall, which ever happens first. <br /> Q58 Enter the number of trained inspectors that were available for construction site <br /> inspections between January 1 , 2015 and December 31 , 2015: <br /> 13 <br /> Q59 Provide the contact information for the inspector(s) and/or organization that <br /> conducts construction stormwater inspections for your MS4. List your primary <br /> construction stormwater contact first if you have multiple inspectors. <br /> (1) Inspector name I Dana Stevens <br /> Organization Fity of Roseville <br /> Phone (Office) 1 6517927047 <br /> Phone (Work Cell) I <br /> Email I dana.stevens@cityofroseville.com <br /> Preferred contact email <br /> method I <br /> (2) Inspector name Dan Turner <br /> F-- <br /> Organization Fity of Roseville <br /> Phone (Office) 6517927045 <br /> Phone (Work Cell) <br /> Email dan.turner@cityofroseville.com <br /> Preferred contact email <br /> method <br /> (3) Inspector name Fance Campbell <br /> Organization Fity of Roseville <br /> Phone (Office) 6517927046 <br /> Phone (Work Cell) <br /> Email vance .campbell@cityofroseville.com <br /> Preferred contact email <br /> method <br /> Q60 What training did inspectors receive? Check all that apply. <br /> k University of Minnesota Erosion and Stormwater Management Certification Program <br /> Qualified Compliance Inspector of Stormwater (QCIS) <br /> Minnesota Laborers Training Center Stormwater Pollution Prevention Plan Installer or <br /> hftps://www.snapsurveys.com/wh/si am/surveylandi ng/pri ntervi ewer.asp?si d=746D70627A7478666D313436333636353735362E3731 11/16 <br />