Laserfiche WebLink
5/19/2016 M S4 Annual Report for 2015 <br /> measurable goals, or future plans for your post-construction stormwater <br /> management program? [Part W.B.] <br /> Yes <br /> N o <br /> MCM 6: Pollution Prevention/Good Housekeeping for Municipal Operations <br /> The following questions refer to Part III.D.6. of the Permit. <br /> Q66 Enter the total number of structural stormwater BMPs, outfalls (excluding <br /> underground outfalls), and ponds within your MS4 (exclude privately owned). <br /> Structural <br /> stormwater 210 <br /> BIVIPs <br /> Outfalls 184 <br /> Ponds 133 <br /> Q67 Enter the number of structural stormwater BMPs, outfalls (excluding underground <br /> outfalls), and ponds that were inspected from January 1 , 2015 to December 31 , <br /> 2015 within your MS4 (exclude privately owned). [Part III.D.6.e.] <br /> Structural <br /> stormwater 63 <br /> BIVIPs <br /> Outfalls 40 <br /> Ponds 25 <br /> Q68 Have you developed an alternative inspection frequency for any structural <br /> stormwater BMPs, as allowed in Part III.D.6.e.(l) of the Permit? <br /> C) Yes <br /> (A) N o <br /> Q69 Based on inspection findings, did you conduct any maintenance on any structural <br /> stormwater BMPs? [Part III.D.6.e.(1)] <br /> ( 'J� Yes <br /> C� No <br /> Q70 Briefly describe the maintenance that was conducted: <br /> Cleaning of sediment from inlets, basins, sumps, hydrodynamic seperators, etc. <br /> Raingardens were remulched and additional plants were added as needed. <br /> Q71 Do you own or operate any stockpiles, and/or storage and material handling <br /> areas? [Part III.D.6.e.(3)] <br /> ( I Yes <br /> N 0 <br /> hftps://www.snapsurveys.com/wh/si am/surveylandi ng/pri ntervi ewer.asp?si d=746D70627A7478666D313436333636353735362E3731 13/16 <br />