Laserfiche WebLink
e sign would come from the Planning Division is not included in the Greater Notification costs. It would be ~$133 per time; with a monthly commitment <br />Attachment AMailed Notice to <br />Property Owner <br />number of tenant spaces in all <br /> <br />The mail list for this project using the <br /> <br /> <br /> <br />** <br />YesYesYesYesYesYesYesYes <br /> <br />NoNo <br />Greater Notification with <br />enters <br /> <br />. <br />and the estimated time to mail is calculated at 100 pieces per hour <br />r <br />expanded radius and <br /> <br /> <br />identified. <br />$1,414.04 <br /> <br /> <br />8.50/hour. <br />414 <br />Developer Open House <br /> <br />Invite & Summary <br /> <br /> <br />YesYesYesYesYes <br />The staff time is calculated using $50/hour as an hourly rate, which is significantly lower than the 2016 Schedule rate of $6 <br />NoNoNoNoNo <br /> <br />rezoning application for 1415 County Road B. <br /> <br />s included 71 property owners; 16 people attended the Developer Open House. <br />cost to make th <br /> Comp Plan Text Amendment <br />Subdivision/Plat (4 or more) <br />Greater Notification with <br /> <br />Applications <br /> <br /> Zoning Text Amendment <br /> <br />Comp Plan Map Change <br />Costs <br /> <br /> <br /> <br />Zoning Map Change <br /> <br />$1,195.96 <br />** <br />Minor Subdivision <br />The cost to install and remove a sign is estimated by Public Works to be $200 per time. The <br /> <br /> <br /> <br />enters <br />Options and <br />320 <br />006 <br />Conditional Use <br /> <br /> <br />- <br />Use <br />Interim Use <br />Notification Cost for PF16 <br />r <br /> <br />Land <br />Variance <br /> <br />PUD <br /> <br /> <br />Notification <br />Paper, printing, and postage is estimated to be $.66 per piece for a letter <br /> <br />Staff will also prepare <br />* <br /> <br />Greater Notification <br /> <br />to residential and commercial renters. <br />House notification so correspondences have the 006, the <br /> <br /> <br />Staff will also use a letter rather than a <br />and send the Open House Summary to Open House attendees. <br />enters <br /> <br />$618.28 <br /> <br /> <br /> <br />71 <br />r <br />w/o <br />- <br />aff used PF16 <br />. <br />budget and is not part of the Greater Notification cost <br /> <br />Send information electronically to PC agenda list <br /> <br />postcard so more information can be included. <br /> <br />wƚƭĻǝźƌƌĻ wĻǝźĻǞ <br />Greater Notification costs, st <br /> <br />DƩĻğƷĻƩ bƚƷźŅźĭğƷźƚƓ ε hƷŷĻƩ tƚƭƭźĬźƌźƷźĻƭ <br /> <br /> <br />Current <br /> <br />$260.92 <br />which a public hearing will be held. <br /> <br /> <br />71 <br />Publicize through Nextdoor.com <br /> <br />adius <br /> <br /> <br />Large Development Sign: <br />Mail <br /> <br />the cost is ~$88 per time. <br /> <br />necessary information. <br /> <br />Open House Notices: <br />Increase the mailing r <br /> <br />ion: <br /> <br />current standard of a <br /> <br />Notificat <br />required Open <br />Mail list size <br /> <br />Cost Implications <br /> <br /> <br />Cost <br />the <br /> <br />e <br /> <br />Renter <br /> <br />stimat <br />Notes: <br />To e <br /> <br /> <br /> <br /> <br />----- <br />T <br />* ** <br />- <br /> <br />