Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: August 23, 2016 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• Twin Lakes Parkway Phase III and Twin Lakes Area Signals <br />o Extension of Twin Lakes Parkway from Prior Ave to Fairview Ave and <br />construction of traffic signal at Fairview Ave. and Twin Lakes Parkway. <br />• Contractor is finishing installing utilities and grading the road. Curb and <br />gutter installation will begin shortly. <br />• Fairview signal will likely be installed in September <br />• Due to delays in utility relocates, Twin Lakes Parkway will likely open in <br />October. <br />• 2016 Pavement Management Project <br />o City's annual mill and overlay project. This year approximately 7 miles of roads <br />will be repaved <br />• Numerous areas of the project are ongoing. <br />• Project is over 80% completed. <br />• All areas other than Heinel Drive should be completed by September 1. <br />• Attachment B shows areas that are completed. <br />Heinel Watermain Lining Project <br />o The project has begun and temporary water is being installed. Lining work should <br />begin the week of Augusts 22. <br />• Parks Renewal Pathways <br />o Staff is working on constructing seven new pathway segments with Park Renewal <br />funds. See attachment C for map of proposed locations. <br />• Dale Street— Sandhurst to County Rd B (east side) — Public Works staff <br />has graded the sidewalk. A concrete contractor will install the sidewalk in <br />the near future. <br />• Lexington Ave — County Rd B to Parker Ave (east side) — Likely will be <br />constructed in September 2016. <br />• Cleveland Lift Station <br />o Lift station replacement project at Cleveland & Brenner. <br />o Staff is working with Bolten-Menk on design. Construction late fall or early <br />spring of 2017. <br />• Wheaton Woods Development <br />0 17 lot subdivision near Dale and County Rd C <br />o Developers contractor has rough graded site <br />o Utility work is completed and road construction is ongoing <br />o Wheaton Avenue extension should be completed in early August <br />