My WebLink
|
Help
|
About
|
Sign Out
Home
2016-08-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-08-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 4:05:21 PM
Creation date
8/18/2016 3:56:42 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/23/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Update: <br />• Storm Water Impact Fund <br />o Council delayed approving the storm water impact fund. <br />• Impervious Surface Coverage <br />o Council will be reviewing impervious pervious coverage for different zoned lots <br />at the August 22 meeting. <br />Owasso Private Drive <br />o Installation of PaveDrain storm water system on Owasso Private Drive <br />o Council ordered the preparation of plans and specification. <br />o Anticipate bidding the project this winter for Spring 2017 construction <br />Minnesota Department of Transportation Projects: <br />• Lexington Avenue Bridge Construction <br />o Lexington Avenue will be closed through September. <br />Ramsey County Projects: <br />• Lexington Avenue Bridge Construction <br />o Lexington Avenue will be closed through September. <br />Major Maintenance Activities: <br />• Started tree trimming ahead of pathway maintenance <br />• Mowing right of way <br />• Ongoing general pavement patching continues. <br />• Crack sealing ongoing <br />• Grading and removals for new sidewalk on Dale Street and on Lincoln Drive <br />• Continue working on meter repairs and replacements. We are down to 23 meters needing <br />an upgrade to the new meter and radio. <br />• Collected bacteriological water samples. <br />• Continued with the 2016 sanitary sewer cleaning program. <br />• Replaced hydrant at B2 and Lexington <br />• Repainting fire hydrants <br />Attachments: <br />A: 2016 Project Map <br />B: 2016 PMP Progress Map <br />C: Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.