Laserfiche WebLink
Roseville Public Works, Environment and <br /> Transportation Commission <br /> Agenda Item <br /> Date: September 27, 2016 Item No: 4 <br /> Item Description: Communication Items <br /> Public Works Project updates: <br /> • Twin Lakes Parkway Phase III and Twin Lakes Area Signals <br /> o Extension of Twin Lakes Parkway from Prior Ave to Fairview Ave and <br /> construction of traffic signal at Fairview Ave. and Twin Lakes Parkway. <br /> ■ All underground work is completed. <br /> ■ Curb and gutter should be installed by September 26 with pavement the <br /> following week. <br /> ■ Fairview signal will likely be installed in early October. <br /> ■ Due to delays in utility relocates, Twin Lakes Parkway will likely open in <br /> October. <br /> • 2016 Pavement Management Project <br /> o City's annual mill and overlay project. This year approximately 7 miles of roads <br /> will be repaved <br /> ■ Numerous areas of the project are ongoing. <br /> ■ Project is over 90% completed. <br /> ■ Attachment B shows areas that are completed. <br /> • Heinel Watermain Lining Project <br /> o The watermain lining is completed. <br /> o The street will begin to be replaced the week of September 26. <br /> • Parks Renewal Pathways <br /> o Staff is working on constructing seven new pathway segments with Park Renewal <br /> funds. See attachment C for map of proposed locations. <br /> ■ Dale Street—Sandhurst to County Rd B (east side)—Public Works staff <br /> has graded the sidewalk. A concrete contractor will install the sidewalk in <br /> the near future. <br /> ■ Lexington Ave—County Rd B to Parker Ave (east side)—Likely will be <br /> constructed in October 2016. <br /> • Cleveland Lift Station <br /> o Lift station replacement project at Cleveland& Brenner. <br /> o Staff is working with Bolten-Menk on design. Construction late fall or early <br /> spring of 2017. <br /> • Wheaton Woods Development <br /> 0 17 lot subdivision near Dale and County Rd C <br /> o The first layer of pavement has been installed. <br /> o Final paving and finish work will take place in early October. <br />