My WebLink
|
Help
|
About
|
Sign Out
Home
2016-09-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-09-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 11:24:58 AM
Creation date
9/26/2016 11:24:30 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/27/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Update: <br /> • Storm Water Impact Fund <br /> o Council approved a non-residential storm water impact fund. <br /> • Erosion Control Ordinance <br /> o At the September 26 Council meeting, Council will be considering amending the <br /> erosion control ordinance to reduce when permits are required from 10,000 SF of <br /> disturbance to 5,000 SF. <br /> Minnesota Department of Transportation Projects: <br /> • Lexington Avenue Bridge Construction <br /> o Lexington Avenue should be opened to traffic on September 29. <br /> o Work on the east bound ramps will continue through November. <br /> Major Maintenance Activities: <br /> • Paved a portion of the Victoria Ballfields parking lot at Central Park <br /> • Pathway maintenance <br /> • Mowing right of way <br /> • Ongoing general pavement patching continues. <br /> • Continue working on meter repairs and replacements_ We are down to 18 meters needing <br /> an upgrade to the new meter and radio. <br /> • Collected bacteriological water samples. <br /> • Continued with the 2016 sanitary sewer cleaning program. <br /> • Replaced hydrant at Dale St north of County Road B. <br /> • Repaired a valve along Marion, south of Minnesota. <br /> • Replaced the majority of the flooring in City Hall <br /> • Refurbished the lower level east side bathrooms in City Hall. Upstairs bathrooms will be <br /> refurbished in early October. <br /> Attachments: <br /> A: 2016 Project Map <br /> B: 2016 PMP Progress Map <br /> C: Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.