Laserfiche WebLink
Item 8L�: Attachment <br />B. Prior to its proceedin� with dzsi�n activities for the Pr•oject the Public Entity <br />sha11 prepare a predesign packa�e and submit it to the Commissioner of Administration for <br />the State of Minnesota for review and comment. The predesio packa�e must be sufflcient <br />to define the purpose, scope, cost, and projected schedule for the Project, and must <br />demonstrate that the Project has been analyzed according to appropriate space and needs <br />standards. Any substantial chan�es to such predesign packa�e must be submitted to the <br />Commissioner of Administration for the State of Minnesota for re�°iew and comment. <br />C. If the Project includes the construction of a ne�v buitding, substantial addition to <br />an existin; building, a substantial chan�e to the interior configuration of an existing <br />building, or the acquisition of an interest in land, then the Public Entity shall not prepare <br />final plans and specifications until it has prepared a pro�ram plan and cost estimates for all <br />e�ements necessary to complete the Project and presented them to the Chairs of the <br />Minnesota State Senate Finance Committee and Minnesota House of Representatives Ways <br />and Means Committee and the chairs have made their recommendations, and it has notified <br />the Chair and Ranking Nlinority Member of the Minnesota House of Representatives <br />Capital Investment Committee and the Chair and Ranking ��Iinority Member of the <br />Minnesota State Senate Capital Investment Committee. The pro�ram plan and cost <br />estimates must note any si�nificant chan;es in the work to be performed on the Project, or <br />in its costs, which have arisen since the appropriation from the le�islature for the Project <br />was enacted or which differ from any previous predesi�n submittal. <br />D. The Public Entity must notify the Chairs and P�ankin� ti'Iinority N[embers of the <br />ti�linnesota State Senate Finance and Capital Investment Committees, and the Nlinnesota <br />House of Representatives Capital Investment and titi'ays and �Izans Committees of any <br />si�,nificant chan�es to the pro�ram plan and cost estimates referred to in Section 7.10.C. <br />E. The pro;ram plan and cost estimates referred to in Section 7.10.0 must ensure <br />that the Project �vill comply with all applicable ener�y conservation standards contained in <br />law, includin� Minn. Stat. ,��' �? 16C.19 to 216C.20, as they may be amended, modified or <br />ceplaced from time to time, and all rules adopteci thereunder. <br />F. If any of the Pro`ram Grant is to be used for the construction or remodelinj of <br />the Facility, then both the predesi�n package reFerred to in Section 7.10.B and the pro;ram <br />plan and cost estimates referred to in Section 7.10.0 must include provisions for cost- <br />effective information technology investments that will enabte the occupant of the Facility to <br />reduce its need for office space, provide more of its services electronically, and decentraliae <br />its operations. <br />G. If the Project does not involve the construction of a new building, substantial <br />addition to an existin; building, substantial chanoe to the interior configuration of an <br />existinj buildin�, or the acquisition of an interest in land, then prior to bejinning work on <br />the Project the Public Entity shall just notify the Chairs and Rankin� Minority Members of <br />the Minnesota State Senate Finance and Capital Investment Committees, and the Nlinnesota <br />House of Representatives Capital Investment and Ways and Means Committees that the <br />work to be performed is ready to be�in. <br />Gencric GO f3ond Proceeds 29 <br />Grant A�reement for Program F,nd Grant� <br />V ar — 6/30/ 1-1 <br />