My WebLink
|
Help
|
About
|
Sign Out
Home
Res_11365
Roseville
>
City Council
>
City Council Resolutions
>
11xxx
>
11300
>
Res_11365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2016 10:19:44 AM
Creation date
10/5/2016 3:55:54 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
9/26/2016
Meeting Type
Regular
Resolution #
11365
Resolution Title
Approval of Grant Agreement Between Metropolitan Council and the City of Roseville for Grant Eligible Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item 8h: Attachment <br />Attachment �' to Gr1nt Agreement <br />JOBS REPORTING <br />(a) Pursuant to Minn. Stat. Sec. 16A.633, subd. 4, State Entity is required to report the <br />number of jobs created or retained by the Project. To enable State Entity to comply with Minn. <br />Stat. Sec. 16A.633, subd. 4, the Public Entity is required to report the number of jobs created or <br />retained by the Project to State Entity as set forth belo�v. <br />(b) The Public Entity shall require all of its contractors to report the information below to <br />the Public Entiry. The Public Entity shall then report to State Entity. Information can be recorded <br />by State Entity in an Esce1 document that can be downloaded into the report by Minnesota <br />Management and Bud�et. Each report must contain the follo�vin«: <br />(13j <br />The name of the Project. <br />The State Entity's contract numbec, if applicable. <br />Reportin� period. The appropciate�biennium is t� be selected. <br />T'he A�ency Number. This will complete the neYt column with Agency <br />Name. <br />Legal Citation for the Authorization. <br />Department ID responsible for the Project. <br />The Appropriation for the Project. <br />The Appropriation Amount. <br />Project Start Date. <br />Project Completion Datz. <br />The Counry �vhere the Project is located or, if it is located in more than <br />one county, �tihere it is primarily located. <br />FundinQ Source for Project. The selection �vi11 bz Tnink Hi�h�vay Bonds, <br />General Obli�ation Bonds or General Fund. <br />Job Ty�pe. Jobs should be classified as either (i) en�,ineerin�;'professional, <br />(ii) construction, or (iii) other. Nlana�er and supervisor jobs shall be <br />classified as cate�ory (i), (ii) or (iii) based on the nature of the �vork those <br />individuals spent the majority of their time overseein�. <br />Hourly Wa�es. Jobs shoulcl be classified accordin� to the hourly pay <br />ranges below. O��erhead or indirect costs or the value of pensions or other <br />benefits should not be included in �va�es. <br />less than � 10.00, <br />� 10.01 to � 15.00, <br />$15.01 to �20.00, <br />�20.01 to �25.00, <br />�2�.01 to �30.00, <br />�30.01 to �35.00, <br />�3�.01 to �40.00, or <br />mc�re than �40.00. <br />Generic GO Bond Proce�d� <br />Gr�nt A�raement tbr Proe�r�m End Grants <br />43 <br />Ver — 6/30i 1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.