My WebLink
|
Help
|
About
|
Sign Out
Home
2016-12-07_PC_Agenda_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Agendas and Packets
>
2016 Agendas
>
2016-12-07_PC_Agenda_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 10:12:47 AM
Creation date
1/5/2017 10:12:39 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Agenda/Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Proposal for the 2040 Comprehensive Plan Update for the City of Roseville <br />Downtown Revitalization Project <br />City of North St. Paul <br /> ort for this public investment to redesign and revitalize Seventh <br />Street, the main street in downtown North St Paul. Engagement included large public meetings, attendance at <br />community events such as the local car show, and small group meetings with business owners. WSB also developed <br />a visual preference survey, which was administered in person and online. Areas of agreement between residents and <br /> ort was input on the priority issues facing the downtown, <br />ideas on how it could be improved, and focus areas for the design. All input will be used in the upcoming Downtown <br />Master Plan to complete the design of the road and streetscape. <br />Comprehensive Plan Update <br />City of Long Lake <br />WSB is in the preliminary stages of assisting the City of Long <br />Lake with its comprehensive plan. The necessary data has <br />been collected in order to complete the required components <br />in conformance with the Metropolitan CouncilÕs requirements. <br />Draft sections of the plan will be delivered throughout 2017 with <br />a project completion targeted for early 2018. The Long Lake <br />Comprehensive Plan is being managed by Addison Lewis. <br />Consultant Prior Experience <br />15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.