Regular Planning Commission Meeting <br />Draft Minutes – Wednesday, December 7, 2016 <br />Page 5 <br />Ms. Perdureferenced the conceptual schedule identified by WSB (page 30 of the plan <br />174 <br />update document; with Chair Boguszewski asking that for future iterations, a larger plan <br />175 <br />be provided for better visibility, duly noted by Ms. Perduafter it was further refined form <br />176 <br />tonight’s discussion and that additionaldetail provided in a more readable format. <br />177 <br />Ms. Perdunoted the preliminary plan called for kicking off with public engagement <br />178 <br />specific to land use and housing issues, followed by economic development, resilience <br />179 <br />and updating the Park Master Plan.Ms. Perdunoted the intent for a considerable <br />180 <br />amount of public engagement in different forms throughout the process. <br />181 <br />Chair Boguszewski asked is the conceptual schedule with its sequences and elements <br />182 <br />had been approved by the City Council, or if the PC could add or omit items. <br />183 <br />Ms. Major advised that the schedule was very preliminary, and the intent of presenting it <br />184 <br />was to obtain PC feedback and their perspective of what would or would not work as <br />185 <br />everyone was on the same team and to ensure a collaborative effort. <br />186 <br />Ms. Perduconcurred, noting the purpose of showing the PC this preliminary effort was <br />187 <br />simply to show what the team was attempting to accomplish throughout the process. <br />188 <br />While the overall scope had been approved by the City Council, Ms. Major noted that the <br />189 <br />City Council had encouraged the PC’s involvement in how best to accomplish the goals <br />190 <br />of each component. <br />191 <br />Since this is the first look at the comprehensive plan update since last discussing in June <br />192 <br />of 2016, Member Kimble asked that was and was not before the PC as far as the <br />193 <br />components to be updated.Member Kimble asked if there was another consultant <br />194 <br />chosen for the chapters simply needing technical updates. <br />195 <br />Mr. Perdureviewed those chapters: infrastructure, transportation, water, wastewater, <br />196 <br />and surface water; with the technical chapters required by the Metropolitan Council <br />197 <br />intended to be updated by city staff and the WSB team in-house.Ms. Perduadvised that <br />198 <br />there were at least two other consultants involved throughout the process to assist staff <br />199 <br />with technical updates.Once those separate processes and timelines were completed, <br />200 <br />Ms. Perduadvised that those chapters will be integrated into the complete document for <br />201 <br />the PC’s final review and recommendation to the City Council. <br />202 <br />As noted by Mr. Lloyd, the ParkMaster Plan would only be updated, with few revisions <br />203 <br />anticipated through this process; with Chair Boguszewski in agreement that little debate <br />204 <br />would be needed on that aspect. <br />205 <br />Member Murphy asked what was intended for public safety components (e.g. fire and <br />206 <br />police). <br />207 <br />Ms. Perduadvised that, as the process moved forward, the team would like to discuss <br />208 <br />that in more detail.Ms. Perdunoted that their impression from city staff and the City <br />209 <br />Council was that the team should include public safety as a lens throughwhich to review <br />210 <br />all elements of the plan and consult with city staff accordingly, and to learn from the PC <br />211 <br />based on their input. <br />212 <br />While recognizing that updates were ongoing by both departments, Member Murphy <br />213 <br />stated he wasn’t sure how to capture it in the comprehensive plan update or if and when <br />214 <br />it was appropriate to do so. <br />215 <br />As part of that housekeeping or logistics issue, Chair Boguszewski asked if the team had <br />216 <br />a website linking all documents for the project.Chair Boguszewski noted that this would <br />217 <br />then allow document control for the City Council, CEC, PC or other groups involved to <br />218 <br />review those documents throughout the process. <br />219 <br /> <br />