My WebLink
|
Help
|
About
|
Sign Out
Home
2016-10-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-10-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 12:06:24 PM
Creation date
1/25/2017 12:04:24 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/25/2016
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Estimated to line 5.5 miles of sanitary sewer main and 0.1 miles of storm sewer <br />o Opening bids in November <br />Wheaton Woods Development <br />0 17 lot subdivision near Dale and County Rd C <br />o The first layer of pavement has been installed. <br />o Final paving and finish work will take place in October. <br />City Council Update: <br />• Erosion Control Ordinance <br />o The City Council amended the erosion control ordinance to reduce when permits <br />are required from 10,000 SF of disturbance to 5,000 SF. <br />City Campus Solar Project: Staff is continuing to work with Sundial Solar to finalize a <br />proposal to install solar arrays on the roof of at least two City buildings on campus. We <br />will be presenting this proposal to the City Council at the November 141' City Council <br />meeting. <br />Ramsey County Projects: <br />• 2017 Mill and Overlay Projects <br />o County will be holding a public open house on December 1, 2016 from 5-7 PM at <br />Roseville City Hall Council Chambers to discuss proposed lane configuration <br />changes for two pavement resurfacing projects in 2017 <br />• Cleveland Avenue, Iona Lane — Glen Paul Ave (Arden Hills) <br />County Road B, Dale Street to Rice Street <br />Minnesota Department of Transportation Projects: <br />• Lexington Avenue Bridge Construction <br />o Lexington Ave under Hwy 36 will be closed one day on October 31 to complete a <br />mill and overlay of the pavement. <br />o The west bound Hamline ramps will close for two days to complete a mill and <br />overlay. This has been moved to November 1 and 2. <br />o The east bound Lexington ramps will be closed through early November. <br />• The City Council voted to approve Municipal Consent for the 35W Managed Lane <br />Project. This project is not fully funded but is expected to be under construction in 2018 <br />or 2019. The Council also voted to withhold the City's vote for a noise wall along the <br />east side of 35W between County Road C and County Road D. This was partly due to the <br />fact that the wall had already received enough positive votes (points) to approve the wall. <br />There was at least one property owner that voted against the noise wall. <br />• MnDOT will be rehabilitating the pavement on Snelling Ave between Como Ave in St <br />Paul to Highway 36 in Roseville. As a part of this project MnDOT will be adding a <br />second northbound left turn lane at the Snelling and County Road B intersection. This <br />will then match the dual left turn lane for the southbound direction at the same <br />intersection. <br />Major Maintenance Activities: <br />• Re -paved a portion of pathway on County Road C between Hamline and Lexington <br />• New sidewalk preparation on Dale St near County Road B and Lexington Ave near <br />Sherren. <br />• Ongoing general pavement patching continues. <br />• Continue working on meter repairs and replacements. We are down to 18 meters needing <br />an upgrade to the new meter and radio. <br />
The URL can be used to link to this page
Your browser does not support the video tag.