My WebLink
|
Help
|
About
|
Sign Out
Home
2017_0217_FC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Finance Commission
>
Packet
>
2017_0217_FC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 12:08:14 PM
Creation date
3/9/2017 12:07:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Category: Municipal Buildings <br /> <br />Project Title: Building Roof Replacements <br /> <br />Total Estimated Cost: $850,000 <br /> <br />Funding Priority: 2 <br /> <br />Account Number: 4101.XXXX.S16109 <br /> 5110.XXXX.S16109 <br /> <br /> <br />Source of Project Funding <br /> <br /> 2016 <br /> <br /> 2017 <br /> <br /> 2018 <br /> <br /> 2019 <br /> <br /> 2020 <br /> <br />Capital Replacement Fund <br />Utility Fund <br /> <br /> <br /> <br />$140,000 <br />30,000 <br /> <br />$70,000 <br />30,000 <br /> <br /> <br />$200,000 <br />20,000 <br /> <br /> <br /> <br />$150,000 <br />30,000 <br /> <br /> <br /> <br />$150,000 <br />30,000 <br /> <br /> <br /> <br /> <br /> <br />Justification: <br /> <br />All roofing systems have a life expectancy that varies <br />depending on the type of roof system. Single-ply <br />membrane roofs have a life of approximately 20 <br />years. Built-up roofs made of felts and bituminous <br />asphalt generally last 20 to 30 years provided repairs <br />are made when needed. Re-roofing provides an <br />opportunity to evaluate insulation and make upgrades <br />for energy savings. All roof insulating capabilities will <br />be evaluated during replacement of each roof <br />system. <br /> <br /> <br />Scheduling and Project Status: <br /> <br />Projects will be bid and completed in the year that <br />they are budgeted. Bids will be solicited in the early <br />spring for completion during those periods when <br />weather effects will be minimized during construction. <br /> <br /> <br /> <br />2016: Rink B <br /> Well #15 <br />2017: Fire #2 <br /> Well #13 <br />2018: Community Center sky light <br /> Ice Rink A roof <br /> Well #11 <br />2019: Park building roofs <br /> Well #3 <br />2020: Central Fire <br /> WTP #16 <br /> <br />Relationship to General Plan and Other Projects: <br /> <br />This project is consistent with the policy of maintaining the <br />city’s infrastructure. <br /> <br />Effect on Annual Operations Costs: <br /> <br />Added insulation during re-roofing will decrease heating <br />and cooling expenses. <br /> <br /> <br /> <br />Description: <br /> <br />This item provides for the scheduled <br />replacement of roof systems for major <br />community and utility buildings. <br /> <br /> <br />Item #4: Attachment A
The URL can be used to link to this page
Your browser does not support the video tag.