My WebLink
|
Help
|
About
|
Sign Out
Home
2017-3-7_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2017
>
2017-3-7_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 2:44:11 PM
Creation date
3/31/2017 2:44:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.Responded to EAB infestation - Roseville is entirely in the infestation zone <br />15.Completed aesthetic improvements throughout the Skating Center facility including, <br />painting the indoor arena bleachers, walls, hallways & locker rooms. Skating Center staff <br />& volunteers completed the work, Roseville Youth Hockey contributed the funds for <br />paint and materials <br />nd <br />16.Hosted the 2 annual Minnesota Girls Outdoor Hockey Classic, drawing over 600 <br />participants <br />17.Collaborated with the Minnesota Wild & Fox Sports to secure future MN Wild Viewing <br />Parties at the OVAL <br />18.Finalized punch list items on 95% of Renewal Program projects <br />19.Acquired additional parkland at 1716 Marion Street in southeast Roseville <br />20.Acquired additional parkland at 2132 Cleveland Avenue in southwest Roseville. <br />21.Engaged a Community/Resident Advisory Team to analyze the Golf Course Clubhouse <br />replacement options Parks and Recreation Commission effort <br />22.Completed field reconstruction & storm water filtration addition at Upper Villa Park <br />23.Refined a Asset Management Program <br />2017 Parks and Recreation Goals <br />1.Execute a safe and successful Deer Reduction effort continue to monitor inform and <br />education - a target of reducing the herd by 20 <br />2.Cedarholm Golf Course Clubhouse planning, design and begin replacement <br />3.Central Park Bocce Ball Court reconstruction in partnership with the Roseville Central <br />Park Foundation <br />ommunity Park Planning <br />4.C <br />a.1716 Marion Street park planning <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.