Laserfiche WebLink
Department/Division: Storm Sewer Services <br />Project/Initiative Title: Vehicle and Equipment Replacement <br />Total Estimated Cost: $15,000 <br />Funding Source: Storm Sewer Fund (Fees) <br />Annual Operating Budget Impact: N/A <br /> <br /> <br /> <br />Project/Initiative Description: <br />Continuing with the practice of replacing vehicles and equipment in a timely manner to reduce <br />maintenance costs and down time and to maximize the trade in or resale value of the asset, Public Works <br />is proposing to replace the following in the Storm Sewer division: <br />• #172 Zero Turn Mower - $15,000 <br /> <br /> <br />Location: <br />Not applicable. <br /> <br />Item 7: Attachment A <br />53