My WebLink
|
Help
|
About
|
Sign Out
Home
2017_0613_FC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Finance Commission
>
Packet
>
2017_0613_FC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 1:46:53 PM
Creation date
7/14/2017 1:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department/Division: Golf Course Division <br />Project/Initiative Title: Replace Irrigation Controller and Satellite <br />Total Estimated Cost: $30,000 <br />Funding Source: Golf Course Green Fees <br />Annual Operating Budget Impact: N/A <br /> <br /> <br /> <br />Project/Initiative Description: <br />This includes replacement of the six Irrigation Satellite Controllers that were purchased in 1988. They <br />would coordinate with the main controller that is located in the maintenance shop. This system is nearing <br />the end of its useful life with parts very difficult if not impossible to get. <br /> <br />Location: <br />Cedarholm Golf Course Maintenance Shop. <br /> <br />Item 7: Attachment A <br />54
The URL can be used to link to this page
Your browser does not support the video tag.