My WebLink
|
Help
|
About
|
Sign Out
Home
2017_07-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_07-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 11:34:25 AM
Creation date
12/8/2017 11:33:03 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/25/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specific to lining private laterals, Chair Cihacek reported that the PWETC had <br />reviewed this, noting it involved two different processes and contractors from that <br />of the city's mains, and required 100% agreement by affected residents to bear the <br />cost. Chair Cihacek advised that discussions had included whether to include such <br />an option as part of the city's design/engineering bid process when redoing city <br />mains, listing pre -qualified vendors as general information and education for <br />residents. <br />Councilmember McGehee clarified that she wasn't seeking any arbitrary decisions, <br />but simply asked that the city identify a procs that worked and would be <br />compatible with city work when mains Xere done and responsible <br />companies/vendors that the city felt were competent to perform that work at which <br />point residents and individual neighborhoods could make that decision without <br />having a negative impact on the city's main line and its construction and future <br />operation, but providing an opporJ�ity at that time for them to address their lateral <br />lines. 'A <br />Mayor Roe clarified, with confirn by staff and Chairek, that when the <br />city lines its mains, ey make project information availab esidents even <br />though it was not thdiliftLechnology or contractor. <br />Specific to stormwater <br />Heimerl had—anticipa <br />advised <br />discussions. Cihacek�dvised <br />demonstration gar or plantings on <br />ideas with the Parks Recreati C <br />recommendation to the V"hCoun <br />on and C41 <br />i. Mayor R <br />as those ideas <br />ek reported that PWETC member <br />planting options suggested by <br />PWETC would continue those <br />PWETC had discussed possible <br />1 property and would pursue those <br />1 for a possible joint project for <br />Rohe PWETC also collaborate with the Planning <br />Development Department staff as part of that <br />urred, noting the need to consider development <br />forward. <br />A the City Council for their input, advising that the PWETC <br />requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.