My WebLink
|
Help
|
About
|
Sign Out
Home
2017_09-26_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_09-26_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 12:10:59 PM
Creation date
12/8/2017 11:43:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/26/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2❑ <br />WA <br />Will IMF <br />i <br />I <br />L1311I <br />` J� R L <br />/ Wabasso Lake <br />— _— R <br />ake �� Y ■ ■OSLL O <br />Emil lake Shoreview ,/ /� /y <br />�� JutlY Lake V�i�i/LW (iC• V1/( ICA <br />Unnametl J - <br />(Black Tern <br />Pond)Lake <br />O <br />ass oLake <br />oseRoseville Comprehensive Plan <br />Jphine <br />Lake Valley <br />r �� 12 ❑ Park = Pathway Master Plan <br />10 ♦ , Latly rk Roseville MN <br />ake `� Park <br />nAotumn Jornp nave <br />■ 13 <br />0 <br />ER <br />AL�Brlffihall <br />a <br />Senior <br />UA - <br />11C <br />®1I <br />1 <br />Existing Trail (36.43 miles) <br />Existing Sidewalk (45.28 miles) <br />Footpath (1.93 miles) <br />----� Existing Striped Shoulder (29.14 miles) <br />Other (Boardwalk- 0.94 miles) <br />Proposed Segments (18.88 miles) <br />Proposed Striped Shoulder (2.48 miles) <br />Other Gaps (5.63 miles) <br />L <br />Roseville Boundary <br />07Fw w <br />iu Q- <br />R <br />■ Note: 2017 Pathway Projects are <br />Lak• L included as existing segments <br />N _ <br />0 2,000 WSrR <br />Feet — <br />zo <br />19 <br />Northl <br />eig, <br />s <br />y <br />Unnametl- <br />Chflstian <br />r <br />CitylPark <br />'I n 'my <br />4 <br />_ <br />5 <br />L <br />J- <br />C.0WNTIVAROAUIC <br />W <br />itrel Park <br />ACom Park <br />Central25 <br />ale West <br />Park - Nature _ <br />rtral Park- <br />Center <br />boretum <br />CentraIPark <br />Elementary <br />1 <br />Existing Trail (36.43 miles) <br />Existing Sidewalk (45.28 miles) <br />Footpath (1.93 miles) <br />----� Existing Striped Shoulder (29.14 miles) <br />Other (Boardwalk- 0.94 miles) <br />Proposed Segments (18.88 miles) <br />Proposed Striped Shoulder (2.48 miles) <br />Other Gaps (5.63 miles) <br />L <br />Roseville Boundary <br />07Fw w <br />iu Q- <br />R <br />■ Note: 2017 Pathway Projects are <br />Lak• L included as existing segments <br />N _ <br />0 2,000 WSrR <br />Feet — <br />
The URL can be used to link to this page
Your browser does not support the video tag.