Laserfiche WebLink
Attachment B <br />Connects <br />Connects to <br />Addresses a Gap or <br />Connects Highy <br />Volume Usage- <br />Volume Usage- <br />Project Name <br />Description <br />Multiple <br />Regional <br />Barrier in the <br />Connects to Transit <br />Density to Transit or <br />Total Points <br />Rank <br />Population <br />Employment <br />Destinations <br />System <br />Transportation System <br />Parks <br />30 <br />Snelling Avenue <br />Develop off road pathway between County Road B and County Road C <br />5 <br />1 <br />3 <br />3 <br />5 <br />3 <br />5 <br />25 <br />1 <br />A pedestrian bridge across Highway 36 and pathway connection between Rosedale and HarMar <br />18 <br />Rosedale to HarMar Connection <br />Mall. <br />2 <br />1 <br />3 <br />2 <br />5 <br />6 <br />5 <br />24 <br />2 <br />4A <br />County Road C (A) <br />Construct an on -road pathway from Lexington Avenue to Victoria St. <br />5 <br />1 <br />1 <br />3 <br />4 <br />4 <br />5 <br />23 <br />3 <br />Complete off-road pathway on the east side of Lexington Avenue from County Road C to County <br />12C <br />Lexington Avenue(C) <br />Road D. <br />4 <br />1 <br />1 1 <br />3 <br />4 <br />4 <br />1 5 <br />22 <br />4 <br />11 <br />Snelling Avenue South of Highway 36 <br />Complete pathways along Snelling Avenue for improved access to A-BRT transit stations. <br />2 <br />1 <br />3 <br />2 <br />5 <br />4 <br />5 <br />22 <br />4 <br />Complete off-road pathway on the east side of Lexington Avenue from Larpenteur Avenue to <br />12A <br />Lexington Avenue (A) <br />County Road B <br />5 <br />2 <br />1 <br />3 <br />4 <br />1 <br />5 <br />21 <br />6 <br />4B <br />County Road C (B) <br />Construct an on -road pathway from Victoria St to Dale St. <br />5 <br />1 <br />1 <br />3 <br />4 <br />1 <br />5 <br />20 <br />7 <br />Complete off-road pathway on the east side of Lexington Avenue from County Road B to County <br />12B <br />Lexington Avenue (B) <br />Road C. <br />5 <br />1 <br />1 <br />3 <br />4 <br />1 <br />4 <br />19 <br />8 <br />4C <br />County Road C (C) <br />Construct an on -road pathway from Dale St to Western Ave. <br />4 <br />1 <br />1 <br />3 <br />4 <br />1 <br />5 <br />19 <br />8 <br />Complete both on- and off-road pathways within the County Road C alignment from Western Ave <br />4D <br />County Road C (D) <br />to Rice St. <br />4 <br />1 <br />1 <br />3 <br />4 <br />1 <br />4 <br />18 <br />10 <br />Complete both on- and off-road pathways within the County Road C-2 alignment from Snelling <br />3A <br />County Road C-2 East of Snelling A <br />Avenue to Hamlin Ave <br />5 <br />2 <br />1 <br />3 <br />1 <br />1 <br />5 <br />18 <br />10 <br />27B <br />Hamline Avenue B <br />An off-road trail from County Road C to County Road C-2. <br />3 <br />1 <br />1 <br />3 <br />3 <br />1 <br />5 <br />17 <br />12 <br />8 <br />Cleveland Avenue <br />Complete off-road pathway segments between County Road C and County Road D. <br />3 <br />0 <br />2 <br />2 <br />3 <br />4 <br />2 <br />16 <br />13 <br />13 <br />Victoria Street north of C <br />Develop an on- road and off-road pathway from County Road C to County Road D. <br />6 <br />1 <br />1 <br />2 <br />3 <br />1 <br />2 <br />16 <br />13 <br />15 <br />Rice Street <br />Complete an off-road pathway from County Road C to the north City boundary. <br />3 <br />1 <br />0 <br />3 <br />3 <br />1 <br />5 <br />16 <br />13 <br />Complete an off-road pathway within the County Road C-2 alignment from Lexington Ave to <br />3B <br />County Road C-2 East of Snelling B <br />Victoria St. <br />3 <br />1 <br />1 <br />3 <br />1 <br />1 <br />5 <br />15 <br />16 <br />27C <br />Hamline Avenue C <br />An off-road trail from County Road C-2 to County Road D. <br />3 <br />1 <br />1 <br />3 <br />3 <br />1 <br />3 <br />15 <br />16 <br />Work with Arden Hills to develop a regional pathway connection along Snelling Avenue to Old <br />Snelling Avenue in Arden Hills connecting Roseville to Mounds View High School, Valentine <br />10 <br />TH 51 connection to Old Snelling (Arden Hills) <br />Hills Elementary School, Bethel College, Lake Johanna Park and County Road E2 commercial <br />businesses. <br />5 <br />1 <br />1 <br />2 <br />4 <br />1 <br />1 <br />15 <br />16 <br />28 <br />County Road B2 & Snelling <br />Install a sidewalk along the north side of CR B2 between the Snelling Ramps. <br />3 <br />15 <br />16 <br />29 <br />Tamarack Park Connection <br />Install a pathway connection from North McCarron's Blvd to Tamarack Pak. <br />4 <br />14 <br />20 <br />9 <br />Fairview Avenue C (north of B-2) <br />Development of off-road pathways between County Road C2 and County Road D. <br />5 <br />1 <br />2 <br />3 <br />3 <br />0 <br />0 <br />14 <br />20 <br />Develop both on -and off-road pathways within the County Road C-2 alignment from the west City <br />2 <br />Boundary to Snelling Avenue. This corridor would include a pedestrian bridge across I -35W. <br />County Road C-2 West of Snelling <br />2 <br />1 <br />1 <br />2 <br />1 <br />1 <br />5 <br />13 <br />22 <br />5 <br />Construct a sidewalk on the north side of County Road C from Western to Rice Street. <br />County Road C Sidewalk <br />2 <br />1 <br />1 <br />2 <br />3 <br />1 <br />2 <br />12 <br />23 <br />14 <br />Dale Street South <br />The construction of an off-street pathway from Reservoir Woods Pak toLarpenteur Avenue. <br />1 <br />1 <br />1 <br />3 <br />4 <br />1 <br />0 <br />11 <br />24 <br />1 <br />County Road D <br />Develop pathway facilities, both on- and off-road, between Cleveland and Fairview Avenue. <br />3 <br />0 <br />1 <br />2 <br />3 <br />1 <br />0 <br />10 <br />25 <br />20 <br />Judith to Iona Connection <br />Develop a pathway connection between Judith Ave and Ion. Lane. <br />1 <br />1 <br />0 <br />1 <br />1 <br />1 <br />5 <br />10 <br />25 <br />21 <br />Lovell to Minnesota Connection <br />Develop apathway connection between Lovell Ave and Minnesota Street. <br />3 <br />1 <br />1 <br />1 <br />1 <br />0 <br />3 <br />10 <br />25 <br />Develop a pathway connection that creates a fink between the comer of Millwood and Chatsworth <br />23 <br />Millwood to County Road C2 Link <br />through the Ramsey County open space to County Road C2. <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />10 <br />25 <br />Develop a pathway connection along Alta Vista Drive between Larpenteur Avenue and Reservoir <br />26 <br />Alta Vista Drive <br />Woods Pak. <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />2 <br />10 <br />25 <br />25 <br />Cohansey St to HANC Connection <br />Develop a pathway connection between Columsey Street and HANC. <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />9 <br />30 <br />Develop a pathway connection between Cleveland Avenue and Walnut Street along County Road C <br />17 <br />NE Diagonal RR Connection (Walnut to Co Rd C) <br />or along the Railroad right-of-way south of County Road C. <br />2 <br />0 <br />2 <br />3 <br />1 <br />1 <br />0 <br />9 <br />30 <br />16 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake. <br />4 <br />0 <br />2 <br />1 <br />1 <br />0 <br />0 <br />8 <br />32 <br />22 <br />Villa Park Connections <br />Develop a pathway connection from Shryer Ave and from Ryan Ave into Villa Pak. <br />3i <br />0 <br />1 <br />1 <br />1 <br />1 <br />8 <br />32 <br />19 <br />Heinel Drive Connection <br />Developa pathwayconnection between S. Owasso Blvd and Count Road C alongHemet Drive. <br />2 <br />1 <br />0 <br />1 <br />1 <br />1 <br />1 <br />7 <br />34 <br />24 <br />lEustis to St Croix Connection <br />Develop a pathway connection between Eustis Street and St. Croix Street. <br />1 <br />0 <br />1 <br />1 <br />1 <br />1 <br />1 1 <br />6 <br />35 <br />