Laserfiche WebLink
20. Maintenance responsibilities will be assigned based on function and use of the facilities. <br />20.1. The City will be responsible for all pathway maintenance under City Jurisdiction. <br />20.2. Residential property owners will be encouraged to clear snow from iKtthway Commented [CB24]: nre rhy encourage orrequlred? cheat <br />20.3. Commercial and institutional property owners will be responsible to clear snow from city code. <br />adjacent pathways when event is 2 inches or greater. <br />21. The City will develop and implement maintenance practices that will minimize the burden <br />on adjoining properties. <br />21.1. City will minimize property damage during pathway maintenance practices. <br />21.2. City will reestablish turf damaged as a result of pathway maintenance. <br />21.3. City will replace or repair mailboxes damaged by snow removal machinery. <br />21.4. No more snow will be deposited on private driveways and sidewalks then would be <br />typically deposited by street snow removal. <br />21.5. City will make efforts to schedule snow removal to minimize double shoveling. <br />EDUCATION/INFORMATION/REGULATION <br />22. The City shall regularly update this Plan. <br />22.1. The Pathway Master Plan will adopted] <br />22.2. The Plan will be evaluated on a regular <br />into the City's Comprehensive Plan. <br />23. Utilize pathway projects to educate the community about the benefits of a well-planned <br />pathways system. <br />23.1. Staff will pursue grants when available to assist in funding the implementation of pathway <br />network . <br />23.2. Staff work with commurucation staff to report pathway project through various forms of <br />media as an educational and promotional practice. <br />23.3. When projects receive public funding, theywill be required to develop pathway systems <br />that meet the highest of standards in design and construction. <br />23.4. Public pathway systems shall meet the highest of standards in design and construction. <br />Commented [CB25]: Define time line ie at least once every <br />three years <br />Commented [CB26]: Spike 23.3 and 23.4 or moveto an <br />inhnduarny paragraph The statements are really Gaming and not <br />specific guidance and I would local ewe do this anyway. <br />24. Provide proper signage for a safe, user-friendly pathway networl�. commented [csv]: Maybe consoraatewim 14a <br />24.1. Signage standards will betaken from the Minnesota Manual for Uniform Traffic Control <br />Devices. <br />24.2. Sign location and placement guidelines will betaken from the MNDOT manual. <br />24.3. Provide pathway network maps at primarylocations to better orient users to the Roseville <br />system. Accompanying the map shall be a list of rules for pathway etiquette. <br />25. Develop regulations for pathway use and enforcement. <br />25.1. Staff will develop pathway regulations to be published and posted to further improve <br />pathway usability. <br />