My WebLink
|
Help
|
About
|
Sign Out
Home
2017_09-26_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_09-26_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 12:10:59 PM
Creation date
12/8/2017 11:43:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/26/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />2040 Transportation Plan Strategies <br />Programmed Improvements & Studies <br />Roadway: Interstate 35W — South of TH 36 <br />Lead Agency: MnDOT <br />Type of Improvement: Pavement Preservation <br />Goals Addressed: Coordinate Transportation De <br />Network. <br />Strategy: FY 2018 programmed pavementpr <br />Roseville. <br />Roadway: Interstate 35W — County Road C to Lino Lakes <br />Lead Agency: MnDOT <br />Type of Improvement: Pavement Preservation a <br />Goals Addressed: Coordinate nsportaiion Decisio <br />System; Create a Safe and Efficien oacl Network. <br />Strategy: FY 2019 programmed pavement preservation and'l <br />TH 36 through oseville. <br />Roadway: TH 36 <br />Lead Agency: MnDOT <br />Type of Improvement: Pavement Preservation <br />a Sustainable Transportation <br />of TH 36 through <br />Lane ExpansiorT <br />a Sustainable Transportation <br />of MnPASS lanes north of <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network. <br />Stra; 2022 programmedNpent preservation project through <br />Study <br />Roseville. <br />ansportation Decisions; Create a Sustainable Transportation <br />System; Create a Safe and Efficient Roadway Network. <br />Strategy: MnDOT is currently studying the addition of an eastbound and westbound MnPASS <br />lane along TH 36 from just east of 35W extending east through the City of Roseville. City of <br />Roseville officials should work closely with MnDOT, Metropolitan Council and others to ensure <br />that any recommended MnPASS improvements resulting from this study are integrated into <br />MnDOT's FY 2022 programmed pavement preservation project along this corridor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.