My WebLink
|
Help
|
About
|
Sign Out
Home
2017_09-26_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_09-26_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 12:10:59 PM
Creation date
12/8/2017 11:43:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/26/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadway: County Road C Railroad Bridge West of Victoria Street <br />Lead Agency: Ramsey County <br />Type of Improvement: Bridge Replacement <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />System. <br />Strategy: Submit bridge replacement for State Bridge Bond funding during the 2018 Legislative <br />Session with a potential construction year of 2020 or 2021, if successful. Due to the deficient <br />bridge at this location, County Road C is currently load restricted west of Victoria Street. <br />Roadway: County Road C: CSAH 88 in Hennepin Court st of Long Lake Road in the City <br />of Roseville <br />Lead Agency: Ramsey County <br />Type of Improvement: Full Reconstruction <br />Goals Addressed: Coordinate Transportat isions; Create a Sustainable Transportation <br />System. <br />Strategy: FY 2020 programmed full reconstruc ion projecl&Also, potential addition of a <br />separated bicycle trail and side Ik improvements.. <br />Roadway: Cleveland Avenue/C n Road 46 at Cot <br />Lead Agency: Ramsey County ih� <br />Type of Improvement: <br />ble Transportation <br />ce existing signal or construct a new roundabout <br />on Interstate 35W. <br />Road B2 to County Road C2 <br />or Pavement Preservation <br />Goals Addresse4IC-oordinTransportation Decisions; Create a Sustainable Transportation <br />System. <br />Strategy: FY 20d project (tentative), pending research into right-of-way costs. <br />full reconstructi, the project scope may be scaled back to a pavement <br />preservation pro. <br />Roadway: County Road B: Snelling Avenue/TH 51 to State Farm Road <br />Lead Agency: Ramsey County <br />Type of Improvement: Pavement Replacement <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />System. <br />Strategy: FY 2019 programmed pavement replacement project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.