Laserfiche WebLink
Ave/County Road B ramps and access to TH 280. Staff will bring more information on <br />this project to Commission as details are made available. <br />Major Maintenance Activities: <br />• Completed the third full City Sweep. Full fall sweep will commence in early/mid- <br />November depending on leaf drop timing. <br />• Irrigation systems have been winterized. <br />• Completed 1800' of pathway reclamation, paving and hydro -seeding in Rosebrook Park. <br />Added an additional 500' of new pathway in Rosebrook Park. <br />• Of the 4800 City Storm Sewer Catch Basins, 1048 have been repaired in the last 7 years <br />with the contractor following up with a Flex Seal Product on 673 catch basins. Annual <br />Pavement Management Projects have repaired a significant number also. <br />• Plow Trucks have gone through prewinter inspection. Salt controllers have had their <br />annual recalibration. <br />• Repaired two broken water mains <br />• Began inspecting utility structures in the 2018 PMP areas <br />Attachments: <br />A: 2017 Project Map <br />B: October Development Activity Report <br />C: Oasis Pond Project Plan Sheets <br />