My WebLink
|
Help
|
About
|
Sign Out
Home
2017_11-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_11-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 2:22:52 PM
Creation date
12/8/2017 2:14:29 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadway: County Road D at Fairview Avenue North <br />Lead Agency: Ramsey County/ City of Roseville <br />Type of Improvement: Intersection Control/ Operations <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: The intersection is controlled by an all -way stop and significant backups currently <br />occur, particularly northbound. Current intersection geometrics and intersection control <br />should be evaluated at this location to assess if any design and/or intersection control <br />upgrades should be made. <br />Roadway: Fairview Avenue: TH 36 south ramp through County Road B2 <br />Lead Agency: City of Roseville/MnDOT <br />Type of Improvement: Signal Timing <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: Poor signal timing along Fairview Avenue currently creates multiple stops and <br />backups through this signalized corridor. Review of signal timing should occur along <br />Fairview Avenue from the TH 36 south ramp through County Road B 2 to better time and <br />coordinate these signals. <br />Roadway: Lydia Avenue and County Road C2 at Snelling Avenue (TH 51) <br />Lead Agency: MnDOT/City of Roseville <br />Type of Improvement: Signal Timing <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: Extremely long green cycle lengths along Snelling Avenue and short cross street <br />green times along Lydia Avenue and County Road C2 lead to long backups and frequent <br />cycle failures at each intersection. A review of signal timing at these two intersections should <br />take place to determine if any adjustments can be made to improve traffic flow through this <br />area. <br />Roadway: County Road C: Victoria Street through Western Avenue <br />Lead Agency: Ramsey County/ City of Roseville <br />Type of Improvement: Intersection Control <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: All -way stops at Victoria Street, Dale Street and Western Avenue create large <br />queues at times along County Road C. Review of these intersections should occur to <br />determine if all -way stops should remain in-place or if roundabouts or signals would work <br />better. <br />ChapterX—Transportation (DRAFT) <br />Adopted XXXXXXXX XX, 2017 <br />Page X-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.