outlet off of Cohansey St on the east end of Central Park. The outlet is failing and <br />in need of repair. <br />• The Walsh Pond Lift Station located in Midland Hills will be replaced. The lift <br />station was built in 1973. The project has been bid and should be constructed by <br />May 2018. <br />• Staff will be working with Rice Creek Watershed District to install an Iron <br />Enhanced Sand filter adjacent to Oasis Pond. Clean Water Land and Legacy <br />money ($340,000) was awarded to the District by the State. <br />• This existing pond located near Oakcrest Ave, east of Fairview is an existing <br />storm pond with a concrete ditch captures water from Rosedale Commons, and <br />provides rate control during large rain events. Staff will be studying and <br />designing plans to retrofit this pond to have an Iron Enhanced Sand Filter bench <br />installed around the perimeter. This filter bench will provide similar rate control, <br />but it will increase the removal of pollutants that degrade our local water <br />resources. The addition of this project will help the City meet a Total Maximum <br />Daily Load (TMDL) for Long Lake. Construction would not occur in 2018 but at <br />a later date. <br />• Staff is currently studying the Fairview Trunk Storm Sewer System. This storm <br />sewer is currently overcapacity given its drainage area and 1960's design <br />standards. <br />• <br />Staff will design an underground storage and reuse project to be located along the <br />Fairview Trunk System, south of County Road B. The project will capture water <br />from the trunk line and allow for storage and help alleviate local drainage and <br />flooding issues. The stored water will also be available to use for irrigation at <br />Evergreen Park, or will be drained back into the system when capacity is <br />available. The project design will start after the analysis of the Fairview Trunk <br />line is complete. The City received $300,000 in State Grant Funds from the Met <br />Council, and will also work with the Rice Creek Watershed District on the <br />proj ect. <br />• Staff will work on maintaining Ditch 2 from the St Croix Lift Station to County <br />Road D. Maintenance will include tree and brush removal. Staff will then follow <br />up to review the ditch profile to ensure it is flowing as intended, and that it can <br />adequately handle the volume and rate from the lift station. <br />4. Other Improvements <br />Rail Road Crossing Upgrades: Staff will be working with Minnesota Commercial Railway <br />to replace two railroad crossings. One on Long Lake Road and the other on County Road C2. <br />The existing railroad crossing of the roadways are in poor condition. The project will consist <br />of replacing the tracks in the roadway with a new concrete surface and new rails. Municipal <br />State Aid funds will pay for the City portion of the costs. <br />Twin Lakes East Collector: As an extension of the Twin Lakes Parkway improvements, the <br />intersections of Terrace Ave and Lincoln Ave, and Lincoln Ave and C-2 will be evaluated to <br />provide a better connection from Fairview Ave to Snelling Avenue. An additional left turn <br />