Laserfiche WebLink
• Worked with the engineers and contractor on the Booster Station project. <br />• Repaired five broken water mains. <br />• Met with the fire department and ISO to discuss the city's ability to provide water and <br />hydrants for fighting fires. <br />Attachments: <br />A: 2017 Project Map <br />B: November Development Activity Report <br />