My WebLink
|
Help
|
About
|
Sign Out
Home
2017_11-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_11-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 2:22:52 PM
Creation date
12/8/2017 2:14:29 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The interpretation of the functional area of an intersection shallbe made by the County <br />Engineer and adjustments to these distances shallbe made, as appropriate to the <br />particular situation. Diagrams of intersection functional areas are shown below. <br />DOWNSTREAM I — I UPSTREAM <br />UPSTREAM <br />_ foi Arse Of me.roeam. <br />FliAreaor mm.ew. <br />I nm.mn.. <br />Oueue-9lenpe ma:i Didi peMeprioo-Ressi <br />Liniev.w <br />e, <br />-- �'--—®®®----------- ®------ — ®-- <br />If no access to a parcel can be obtained, except from a County Road or County State Aid <br />Highway, Ramsey County aclamwledges that a parcel has the right to one access, <br />subject to approvalby the County Engineer. More than one access maybe approved, but <br />should not be assumed. <br />The need for turn lanes, bypass lanes, medians or median improvements, signage, or <br />any other accommodations necessary for safe operation of an access shallbe determined <br />by the County Engineer and incorpora ted into access permit provisions. All <br />construction coats shall be paid for by the permit applicant Ramsey County will not <br />contribute to the costa of necessary improvements. <br />The need for a Traffic Impact Study for any proposed access shallbe determined by the <br />County Engineer. The County Engineer may require installation of any mitigation <br />measures recommended by a Traffic Impact Study. <br />The County Engineer may require dedication of access control over the remainder of a <br />parcel as a condition of granting access in a particular location. <br />It shorldbenoted that there are existing acceeapointswithin thea that are incogassistentsair <br />Ramsey County's draft access management policies. In many cases these access pointe were <br />Chapter% —Transportation (DRAFT) Page x-12 <br />Adopted xxxxxxxxx XX, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.