My WebLink
|
Help
|
About
|
Sign Out
Home
2017_11-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_11-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 2:22:52 PM
Creation date
12/8/2017 2:14:29 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadway: County Road B: County Road 48/ Fairview Avenue to East of TH 51/ Snelling <br />Avenue <br />Lead Agency: Ramsey County <br />Type of Improvement: Traffic Operations Study <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: The 2011-2015 crash rate for this segment was greater than 12 per million vehicle <br />miles, which exceeds the statewide average. City officials should coordinate with Ramsey <br />County to conduct a detailed traffic operations study of this segment this intersection to <br />evaluate potential strategies to lower this crash rate. Opportunities to make improvements at <br />this location in conjunction with scheduled Capital Improvement Program work should be <br />explored. <br />Roadway: Roselawn Avenue West: County Road 50/Hamlin Avenue to TH 51/Snelling <br />Avenue <br />Lead Agency: City of Roseville <br />Type of Improvement: Traffic Operations Study <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: The 2011-2015 crash rate for this segment was greater than 12 per million vehicle <br />miles, which exceeds the statewide average. City officials should coordinate with Ramsey <br />County to conduct a detailed traffic operations study of this segment this intersection to <br />evaluate potential strategies to lower this crash rate. Opportunities to make improvements at <br />this location in conjunction with scheduled Capital Improvement Program work should be <br />Roadway: County Road 132: County Road 48/ Fairview Avenue to TH 51/ Snelling Avenue <br />Lead Agency: Ramsey County <br />Type of Improvement: Traffic Operations Study <br />Goals Addressed: Coordinate Transportation Decisions; Create a Sustainable Transportation <br />Network; Create a Safe and Efficient Roadway Network. <br />Strategy: The 2011-2015 crash rate for this segment was between 9 and 12 per million vehicle <br />miles, which exceeds the statewide average. City officials should coordinate with Ramsey <br />County to conduct a detailed traffic operations study of this segment this intersection to <br />evaluate potential strategies to lower this crash rate. Opportunities to make improvements at <br />this location in conjunction with scheduled Capital Improvement Program work should be <br />ChapterX-Transportation (DRAFT) Page X-55 <br />Adopted XXXXXXXX XX, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.