My WebLink
|
Help
|
About
|
Sign Out
Home
Ord_1536
Roseville
>
City Council
>
City Council Ordinances
>
1500
>
Ord_1536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 1:03:58 PM
Creation date
12/13/2017 10:31:46 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
12/4/2017
Meeting Type
Regular
Ordinance #
1536
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2018 FEE SCHEDULE
Ordinance Date Passed
12/4/2017
Ordinance Date Published
12/12/2017
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> House Moving Permit Fee: <br /> Over private property only $ 95.00 $ 95.00 <br /> Over public streets 137.00 137.00 <br /> Investigation fee(hourly) 69.50 70.00 <br /> Manufactured Home Permit Fee(new installation) 275.00 275.00 <br /> Mechanical Permit Fee-Residential: <br /> Air conditioning:replacement 61.00 61.00 <br /> Warm air furnace:new 102.00 - Eliminated in 2018 <br /> Warm air furnace:replacement 61.00 61.00 <br /> Hot water boilers:new 102.00 - Eliminated in 2018 <br /> Hot water boilers:replacement 61.00 61.00 <br /> Unit heaters 61.00 61.00 <br /> Swimming pool heaters 61.00 61.00 <br /> New construction, misc. work&gas piping 1.28%of job cost $61.00 minimum fee <br /> Minimum fee 61.00 61.00 <br /> Gas fireplace 61.00 61.00 <br /> In floor heat 85.00 85.00 <br /> Mechanical Permit Fee- Commercial(All) 1.28%of job cost $61.00 minimum fee <br /> Plan Review Fee: 65% 65% %of building permit fee <br /> Plumbing Permit Fee: <br /> Minimum fee 61.00 61.00 <br /> Additional for each fixture opening 10.00 10.00 <br /> Backflow prevention device 10.00 10.00 <br /> Miscellaneous work 1.28%of job cost <br /> Sewer Connection Permit Fee-Community Develop: <br /> Residential $ 96.00 $ 96.00 <br /> Commercial 303.00 303.00 <br /> Repair 61.00 61.00 <br /> Disconnect:residential 85.00 85.00 <br /> Disconnect:commercial 169.00 169.00 <br /> Sewer Connection/Inspection Permit Fee-Engineering: <br /> Connection:residential 25.00 25.00 <br /> Connection:commercial 75.00 75.00 <br /> Connection:repair 25.00 25.00 <br /> Connection: inspection 75.00 75.00 <br /> Disconnect:residential 25.00 25.00 <br /> Disconnect:commercial 75.00 75.00 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.