Laserfiche WebLink
City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> House Moving Permit Fee: <br /> Over private property only $ 95.00 $ 95.00 <br /> Over public streets 137.00 137.00 <br /> Investigation fee(hourly) 69.50 70.00 <br /> Manufactured Home Permit Fee(new installation) 275.00 275.00 <br /> Mechanical Permit Fee-Residential: <br /> Air conditioning:replacement 61.00 61.00 <br /> Warm air furnace:new 102.00 - Eliminated in 2018 <br /> Warm air furnace:replacement 61.00 61.00 <br /> Hot water boilers:new 102.00 - Eliminated in 2018 <br /> Hot water boilers:replacement 61.00 61.00 <br /> Unit heaters 61.00 61.00 <br /> Swimming pool heaters 61.00 61.00 <br /> New construction, misc. work&gas piping 1.28%of job cost $61.00 minimum fee <br /> Minimum fee 61.00 61.00 <br /> Gas fireplace 61.00 61.00 <br /> In floor heat 85.00 85.00 <br /> Mechanical Permit Fee- Commercial(All) 1.28%of job cost $61.00 minimum fee <br /> Plan Review Fee: 65% 65% %of building permit fee <br /> Plumbing Permit Fee: <br /> Minimum fee 61.00 61.00 <br /> Additional for each fixture opening 10.00 10.00 <br /> Backflow prevention device 10.00 10.00 <br /> Miscellaneous work 1.28%of job cost <br /> Sewer Connection Permit Fee-Community Develop: <br /> Residential $ 96.00 $ 96.00 <br /> Commercial 303.00 303.00 <br /> Repair 61.00 61.00 <br /> Disconnect:residential 85.00 85.00 <br /> Disconnect:commercial 169.00 169.00 <br /> Sewer Connection/Inspection Permit Fee-Engineering: <br /> Connection:residential 25.00 25.00 <br /> Connection:commercial 75.00 75.00 <br /> Connection:repair 25.00 25.00 <br /> Connection: inspection 75.00 75.00 <br /> Disconnect:residential 25.00 25.00 <br /> Disconnect:commercial 75.00 75.00 <br /> 12 <br />