Laserfiche WebLink
City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> Sign Permit Fee-Community Development: <br /> Permanent sign(minimum fee) 55.00 55.00 <br /> Annual sign 100.00 100.00 <br /> Temporary sign 30.00 30.00 <br /> Attention-getting device 30.00 30.00 <br /> Swimming Pool Permit-Community Development: <br /> Residential:in-ground 212.00 212.00 <br /> Residential:seasonal 25.00 25.00 <br /> Commercial Per Building Permit Fee Schedule <br /> Swimming Pool Permit-Engineering 15.00 15.00 <br /> Water Connection Permit Fee-Community Develop: <br /> Residential 96.00 96.00 <br /> Commercial 303.00 303.00 <br /> Repair 61.00 61.00 <br /> Disconnect:residential 85.00 85.00 <br /> Disconnect:commercial 169.00 169.00 <br /> Water Connection/Inspection Permit Fee- Engineering: <br /> Connection:residential 25.00 25.00 <br /> Connection:commercial 75.00 75.00 <br /> Connection:repair 25.00 25.00 <br /> Connection: inspection 75.00 75.00 <br /> Disconnect:residential 25.00 25.00 <br /> Disconnect:commercial 75.00 75.00 <br /> Water Meter Program Fees-Engineering: <br /> Manual meter read surcharge 40.00 20.00 per quarter <br /> Non-standard water meter no-read fee 50.00 50.00 <br /> Denial of access to water meter 100.00 100.00 per quarter <br /> 13 <br />