Laserfiche WebLink
City of Roseville 2018 Fee Schedule <br /> Electrical Permit Fees - Community Development <br /> A. Minimum fee for each separate inspection of an installation, replacement, alteration or repair is <br /> limited to one inspection only: <br /> City 2017 2018 <br /> Electrical Permit Fee Description Code Amount Amount Comments <br /> Minimum fee n/a $ 40.00 $ 40.00 No refunds available <br /> B. Services, changes of service, temporary services, additions, alterations or repairs on either primary <br /> or secondary services shall be computed separately: <br /> City 2017 2018 <br /> Electrical Permit Fee Description Code Amount Amount Comments <br /> Services, changes for services: <br /> 0 to 300 amp n/a $ 50.00 $ 50.00 <br /> 301 to 400 amp n/a 58.00 58.00 <br /> 401 to 500 amp n/a 72.00 72.00 <br /> 501 to 600 amp n/a 86.00 86.00 <br /> 601 to 800 amp n/a 114.00 114.00 <br /> 801 to 1,000 amp n/a 142.00 142.00 <br /> 1,001 to 1,100 amp n/a 156.00 156.00 <br /> 1,101 to 1,200 amp n/a 170.00 170.00 <br /> Add$14 for each additional 100 amps <br /> C. Circuits, installation of additions, alterations, or repairs of each circuit or sub-feeder shall be <br /> computed separately, including circuits fed from sub-feeders and including the equipment served, <br /> except as provided for in (D)through(K): <br /> City 2016 2017 <br /> Fee Description Code Amount Amount Comments <br /> Circuits, changes for services: <br /> 0 to 30 amp n/a $ 8.00 $ 8.00 <br /> 31 to 100 amp n/a 10.00 10.00 <br /> 101 to 200 amp n/a 15.00 15.00 <br /> 201 to 300 amp n/a 20.00 20.00 <br /> 301 to 400 amp n/a 25.00 25.00 <br /> 401 to 500 amp n/a 30.00 30.00 <br /> 501 to 600 amp n/a 35.00 35.00 <br /> 601 to 700 amp n/a 40.00 40.00 <br /> Add$5 for each additional 100 amps <br /> 18 <br />