My WebLink
|
Help
|
About
|
Sign Out
Home
Ord_1536
Roseville
>
City Council
>
City Council Ordinances
>
1500
>
Ord_1536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 1:03:58 PM
Creation date
12/13/2017 10:31:46 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
12/4/2017
Meeting Type
Regular
Ordinance #
1536
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2018 FEE SCHEDULE
Ordinance Date Passed
12/4/2017
Ordinance Date Published
12/12/2017
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2018 Fee Schedule <br /> Electrical Permit Fees: Community Development (continued) <br /> City 2017 2018 <br /> Electrical Permit Fee Description Code Amount Amount Comments <br /> Residential panel replacement n/a $ 100.00 $ 100.00 <br /> Residential sub panel n/a 40.00 40.00 <br /> Minimum fee: <br /> Inspection only n/a 40.00 40.00 Plus $1 State surcharge <br /> Rough-in& final n/a 80.00 80.00 Plus $1 State surcharge <br /> Single-family dwelling/townhouse<200 amps * n/a 175.00 175.00 Plus $1 State surcharge <br /> Apartment buildings (per unit) n/a 70.00 70.00 Excludes cover svc,unit feeders <br /> &house panels <br /> Swimming pool(up to two inspections) n/a 80.00 80.00 <br /> Additions, remodels, basement additions n/a 80.00 80.00 Up to 10 circuits&2 inspections <br /> Accessory structure: <br /> Panel n/a 50.00 50.00 <br /> Per circuit n/a 8.00 8.00 <br /> Inspection n/a 80.00 80.00 <br /> Traffic signals (per standard) n/a 7.00 7.00 <br /> Street&parking lot lights(per standard) n/a 4.00 4.00 <br /> Transformers&Generators: <br /> Up to 10 KVA n/a 10.00 10.00 <br /> 11-75 KVA n/a 40.00 40.00 <br /> 76-299 KVA n/a 60.00 60.00 <br /> 299+KVA n/a 150.00 150.00 <br /> Retro-fit lighting(per fixture) n/a 0.65 0.65 <br /> Sign transformer(each) n/a 8.00 8.00 <br /> Remote control&signal circuits(per device) n/a 0.75 0.75 <br /> Re-inspection fee(in addition to others) n/a 40.00 40.00 <br /> Comments: <br /> * Fee covers a maximum of three inspections <br /> ** Permit fee is doubled if work is started before permit is issued <br /> ** *Minimum fee electrical permits are not refundable <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.