Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: February 27, 2018 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• Water Booster Station Phase 1 <br />Item No: 4 <br />Work on the booster station upgrade is approximately 80% completed. The <br />underground piping has been replaced and the new slab for the generator has been <br />placed. Work to install the new electrical service should be completed by the end <br />of March. <br />Walsh Lift Station Project <br />o Project has been awarded. Construction will most likely start sometime in early <br />spring of 2018. <br />• Parks Renewal Pathway Project <br />o The contractor is currently installing new sidewalks/pathways in the following <br />locations; <br />• North side of County Road B between Dale St and Sandhurst (Completed) <br />• East side of Lexington between Roselawn Ave and County Road B (75% <br />Complete) <br />• West side of Victoria between County Road C and Woodhill Drive <br />• A new pathway within Tamarack Park from Farrington St to the new <br />playground equipment. <br />o Work is anticipated to be completed this spring. <br />• 2018 Sewer CIPP <br />o This year's project involves lining 6.0 miles of sanitary sewer pipe and two small <br />segments of storm sewer. Veit & Companies was awarded the project in <br />November and will begin work on the project in March. <br />Lounge Lift Station <br />This lift station will be rehabbed in the spring with new pumps, controls and a <br />new forcemain. The project was awarded in January to Pember Companies. <br />Construction will begin in the spring. <br />Metropolitan Council Environmental Services updates: <br />• Avon street <br />Project is scheduled to begin in April. Work consists of replacing a section of <br />sewer main, installing a new meter pit, and CIPP lining the rest of the sewer main <br />pipe. Work on this site is scheduled to be substantially completed by the end of <br />October 2018. <br />Upper Villa <br />o Project is scheduled to begin in March. Works consists of installing two new <br />manholes and CIPP lining the sewer main. Work on this site is scheduled to be <br />substantially completed by the end of October 2018. <br />