Laserfiche WebLink
I (It tttcti r. .r the actual cost exceed the foregoing. <br /> 1. The standard collocation agreement shall be in addition to, and not in lieu <br /> of, the required small wireless facility permit, provided, however, that the <br /> applicant shall not be additionally required to obtain a license or franchise in <br /> order to collocate. Issuance of a smal-1 wireless facility permit does not <br /> supersede, alter or affect any then-existing agreement between the city and <br /> applicant, The collocation agreement shall provide for, among other things, <br /> that: (i) permittee does not gain right. title or interest in city owned <br /> infrastructure; (ii) collocated small wireless facility and services shall not <br /> interfere with public safety or public utility communications; (iii) city shall <br /> have right to shut off power to small wireless facility to perform maintenance <br /> work on city infrastructure, after providing reasonable advance notice to the <br /> wireless service provider; (iv) city makes no guarantee as to the condition of <br /> any wireless support structure with regard to applicant' s use; (v) small <br /> wireless facility shall not obstruct light emanating from street lighting <br /> infrastructure used for collocation; and (vi) permittee shall be solely <br /> responsible for to maintain the small wireless facility in good and safe <br /> condition, and shall annually inspect mounting brackets to ensure they are <br /> securely attached to city infrastructure and not causing damage or premature <br /> depreciation of the asset <br /> A.E. By accepting a permit, telecommunications right-of-way user agrees on behalf of itself <br /> and its affiliates, successors and assigns that it will not provid <br /> obtaining a cable franchise or an open video system franchise from the City. (Ord. 1333, <br /> 03 13 2006) <br /> 707.11: PERMIT FEES: <br /> A. Excavation Permit Fee: The excavation permit fee as established by the City Fee Schedule in <br /> Section 314.05,is an amount sufficient to recover the following costs: <br /> 1. The City cost; <br /> 2. Degradation cost, if applicable. <br /> B. Obstruction Permit Fee: The obstruction permit fee shall be established by the City Council <br /> and shall be in an amount sufficient to recover the City cost. <br /> C. Payment of Permit Fees: No excavation permit or obstruction permit shall be issued without <br /> payment of excavation or obstruction fees. The City may allow the applicant to pay such fees <br /> within30 days of billing. <br /> D. Nonrefundable: Permit fees that were paid for a permit that the Director has revoked for a <br /> breach as stated in Section 707.21 of this Chapter are not refundable. (Ord. 1209, 8-24-1998) <br /> 707.12: RIGHT-OF-WAY REPAIR AND RESTORATION: <br /> A. Timing: The work to be done under the excavation permit, and the patching and restoration <br /> of the right of way as required herein,must be completed within the dates specified in the <br />