however, the City must be notified of the project and be provided a copy of the <br />grading, erosion and sediment control plan, as well as an estimated schedule for <br />commencement and completion. The City will notify the designated contact if <br />the grading plan is not being followed, if erosion control measures should fail or <br />require maintenance with the expectation that the deficiencies will be corrected. <br />If no permit has been obtained, a stop work order shall be issued on the construction <br />and a fine shall be issued in an amount equal to twice the required permit fee. A <br />completed grading, erosion and sediment control plan and permit application shall <br />be submitted before construction will be allowed to resume. <br />Obtaining a permit does not exempt the permittee from obtaining permits required <br />by other government regulatory agencies. <br />2. Criteria addressed: The grading, erosion and sediment control plan shall <br />address the following criteria: <br />a. Existing drainage patterns <br />b. Control the storm water leaving the site <br />*-c. Conform to the natural limitations presented by topography and <br />soil so as to create the least potential for soil erosion. <br />b -d. Stabilize all exposed soils and soil stockpiles <br />tee. Establish permanent vegetation <br />4-.f. Prevent sediment damage to adjacent properties and other <br />designated areas <br />,a,-,- Schedule of erosion and sediment control practices <br />€h. Criteria for the use of temporary sedimentation basins <br />gi. Stabilization of steep slopes <br />i-LStabilize all waterways and outlets <br />�.k. Protect storm sewers from the entrance of sediment, debris and <br />trash <br />k-. 1. Control waste, such as discarded building materials, concrete <br />truck washout, chemicals, litter, sanitary waste, etc. that may adversely <br />impact water quality <br />km. When working in or crossing water resources, take precautions to <br />contain sediment. <br />*rn. Re -stabilize utility construction areas as soon as possible <br />tro. Protect paved roads from sediment and mud brought in from <br />access routes <br />�9-p. _Dispose of temporary erosion and sediment control measures <br />t) -._q. _Maintain all temporary and permanent erosion and sediment <br />control practices <br />q -r. Removal of sediment from streets at the end of each day <br />mss. Dewatering methods and outletting of stormwater <br />st. Site inspection plan & record of rainfall amounts <br />t -u. Final stabilization <br />3. Contents of Plan: The grading, erosion and sediment control plan shall <br />include the following: <br />a. Contact information for the Permittee <br />b. Project description: the nature and purpose of the land disturbance <br />activity and the amount of grading involved, including the amount of <br />material removed and imported to the site. <br />c. Phasing of construction: the nature and purpose of the land <br />disturbance activity and the amount of grading, utilities, and building <br />construction <br />d. Existing and proposed site conditions: existing and proposed <br />topography, vegetation, and drainage <br />