Metropolitan Council Environmental Services updates: <br />• Avon street <br />Project is scheduled to begin in May. Work consists of replacing a section of <br />sewer main, installing a new meter pit, and CIPP lining the rest of the sewer main <br />pipe. Work on this site is scheduled to be substantially completed by the end of <br />October 2018. <br />Upper Villa <br />o Project is scheduled to begin in May. Works consists of installing two new <br />manholes and CIPP lining the sewer main. Work on this site is scheduled to be <br />substantially completed by the end of October 2018. <br />County Road 88 & Long Lake Road <br />o Project is scheduled to begin in February of 2019. Works consists of CIPP lining <br />the sewer main. Work on this site is scheduled to be substantially completed by <br />the end of November 2019. <br />Minnesota Department of Transportation updates: <br />• County Road B2 and Snelling signal replacement project is completed. Final cleanup will <br />take place in the spring. <br />• MnDOT is finalizing plans to perform pavement maintenance on 35W south of TH 36 in <br />2018. Included in this project will be the replacement of the traffic signal at Cleveland <br />and County Road B. There will be impacts to some ramps in Roseville including the <br />Cleveland Ave/County Road B ramps and access to TH 280. Staff will bring more <br />information on this project to the Commission as details are made available. <br />• Preliminary discussion and modeling has begun on potential MnPASS Lanes on Highway <br />36 from 35W past 35E (likely just past Highway 61). Full funding has not been identified <br />and discussion continues on whether to build a westbound MnPASS or not. The <br />complexities of how to terminate the westbound MnPASS Lane with the merge into 35W <br />is driving that discussion. <br />Misc. Items: <br />Major Maintenance Activities: <br />• Completed winter tree trimming. <br />• Installing new street names signs and post. <br />• Steaming, thawing frozen shallow storm sewers and catch basins. <br />• Turned leaves at the compost site. <br />• Repaired/fabricated seasonal equipment. <br />• St Paul asphalt plant open and staff is patching as needed. <br />• Repaired eight broken water mains. <br />• Assisted two property owners with frozen services <br />• Collected water samples for bacteriological testing <br />• Collected water samples for disinfection by-product testing <br />• Continued replacing meter heads and radios <br />• Began cutting roots in the sanitary sewer system — following the inspection contractor <br />• Began collecting SCADA data for the Femwood lift station project for 2019 <br />Attachments: <br />A: 2018 Project Map <br />B: February Development Activity Report <br />