Laserfiche WebLink
City Council Work Session Meeting <br /> Monday, April 16, 2018 <br /> Page 11 <br /> City Manager Trudgeon suggested there is an option to rebid the projects. The <br /> cost would be higher than what came back the first time, and that is likely <br /> $700,000. Another option is to use the base layout and look at how to do it dif- <br /> ferently. Going to more modular equipment will save $30,000-$40,000. Vesti- <br /> bules are also $40,000. The drop-downs and signage are all things that could be <br /> looked at and value-engineered, while still using the base plans. A third option is <br /> to start from scratch. Engaging an architect to start that project would be about <br /> $15,000. <br /> Mayor Roe stated the third option is in line with a question he had asked earlier. <br /> To the extent that the current space has walls and spaces, perhaps the insurance <br /> space could be turned into the passport space, and perhaps the License Center and <br /> the current passport space could be reconfigured. <br /> Councilmember Etten asked about the current reserve level and what would the <br /> figures be if the City were to spend down to 10 or 25%reserve. <br /> Finance Director Miller responded the License Center's cash reserve position was <br /> $976,000. The cash reserve policy calls for maintaining 10-25% of annual operat- <br /> ing budget. Doing that affords the City anywhere from $505,000 - $780,000 of <br /> capital spending, while staying within those reserve limits. <br /> Councilmember Etten asked License Center Director Pam Ryan to come up and <br /> discuss using existing walls and offices, while renovating the front portion. <br /> Ms. Ryan, License Center Director, stated that initially the redesign called for an <br /> entire new look and feel. She has not spent time working with the architects on <br /> scaling back and just using the insurance space. Ultimately, more customer space <br /> is needed. Staff is shared with passports and auto dealers, so ideally that staff <br /> needs to be grouped together. MN-LARS has significantly changed the way <br /> business is done in the License Center. <br /> Councilmember McGehee stated the License Center had the money to do what <br /> was proposed, and it still does. Changing the materials and downgrading the look <br /> helps the space and also does not force staff to rework the flow of the service de- <br /> livery. A lot of time has already been spent on that. She is inclined to have staff <br /> look at reducing the fancier finishes, while maintaining flow and workspace. <br /> Councilmember Willmus concurred with those comments. He asked about the <br /> number of work stations on the floor plan, and whether they are utilized all the <br /> time. <br /> Ms. Ryan responded the work stations are utilized, for the most part. On the mo- <br /> tor vehicle side, there are not always two people on tabs, depending on the day <br />