Laserfiche WebLink
The Cedarholm Community Building is now open. The new facility features a porous <br />pavement parking lot over a portion of the overall parking lot. <br />Major Maintenance Activities: <br />• Installed 1,000 plantings on County Road C <br />• Repaired irrigation systems on Larpentuer and Twins Lakes Parkway <br />• Performed numerous other streetscape maintenance <br />• Completed 2°d citywide street sweeping <br />• Ongoing monthly compost turning <br />• Repaired numerous storm sewer repairs <br />• Inspected inlets and outlets after June rainfalls <br />• Completed centerline pavement markings <br />• Ongoing patching in neighborhoods <br />• Extended should on Hamline Avenue near Lydia and Josephine <br />• Completed 2°d City right of way mowing <br />• Delivered compost and woodchips <br />• Ongoing street sign work <br />• Numerous shop repairs on fleet vehicles including 10 PIT cars for the police department <br />for annual PIT training <br />• Continue cleaning sanitary sewer mains <br />• Continue flushing public fire hydrants <br />• Cleaned windows and carpeting in Public Works, Police, City Hall and License Center <br />• Collected water samples for bacteriological testing and disinfectant by-products <br />• Repaired two overhead doors <br />• Continued replacing meter heads and radios <br />• Continued working with engineers and contractors on the 2018 PMP, the Booster Station <br />Phases 1 & 2 projects, the Lounge, Walsh Pond and Femwood Lift Station projects <br />• Repaired the VFD for pump 1 at the Gottfried Pit storm water lift station <br />Attachments: <br />A: 2018 Project Map <br />B: May Development Activity Report <br />