Laserfiche WebLink
Attachment A <br /> City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> 358 House Moving Permit Fee: <br /> 359 Over private property only $ 95.00 $ 95.00 <br /> 360 Over public streets 137.00 137.00 <br /> 361 Investigation fee(hourly) 69.50 70.00 <br /> 362 Manufactured Home Permit Fee(new installation) 275.00 275.00 <br /> 363 Mechanical Permit Fee-Residential: <br /> 364 Air conditioning: replacement 61.00 61.00 <br /> 365 Warm air furnace:new 102.00 - Eliminated in 2018 <br /> 366 Warm air furnace:replacement 61.00 61.00 <br /> 367 Hot water boilers:new 102.00 - Eliminated in 2018 <br /> 368 Hot water boilers: replacement 61.00 61.00 <br /> 369 Unit heaters 61.00 61.00 <br /> 370 Swimming pool heaters 61.00 61.00 <br /> 371 New construction,misc. work&gas piping 1.28%ofjob cost $61.00 minimum fee <br /> 372 Minimum fee 61.00 61.00 <br /> 373 Gas fireplace 61.00 61.00 <br /> 374 In floor heat 85.00 85.00 <br /> 375 Mechanical Permit Fee-Commercial(All) 1.28%ofjob cost $61.00 minimum fee <br /> 376 Plan Review Fee: 65% 65%%of building permit fee <br /> 377 Plumbing Permit Fee: <br /> 378 Minimum fee 61.00 61.00 <br /> 379 Additional for each fixture opening 10.00 10.00 <br /> 380 Backflow prevention device 10.00 10.00 <br /> 381 Miscellaneous work 1.28%of job cost <br /> 382 Sewer Connection Permit Fee-Community Develop: <br /> 383 Residential $ 96.00 $ 96.00 <br /> 384 Commercial 303.00 303.00 <br /> 385 Repair 61.00 61.00 <br /> 386 Disconnect: residential 85.00 85.00 <br /> 387 Disconnect: commercial 169.00 169.00 <br /> 388 Sewer Connection/Inspection Permit Fee-Engineering: <br /> 389 Connection:residential 25.00 25.00 <br /> 390 Connection: commercial 75.00 75.00 <br /> 391 Connection:repair 25.00 25.00 <br /> 392 Connection: inspection 75.00 75.00 <br /> 393 Disconnect: residential 25.00 25.00 <br /> 394 Disconnect: commercial 75.00 75.00 <br /> 14 <br />