Laserfiche WebLink
Attachment A <br /> City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> 395 Sign Permit Fee-Community Development: <br /> 396 Permanent sign(minimum fee) 55.00 55.00 <br /> 397 Annual sign 100.00 100.00 <br /> 398 Temporary sign 30.00 30.00 <br /> 399 Attention-getting device 30.00 30.00 <br /> 400 Swimming Pool Permit-Community Development: <br /> 401 Residential: in-ground 212.00 212.00 <br /> 402 Residential: seasonal 25.00 25.00 <br /> 403 Commercial Per Building P ermit Fee Schedule <br /> 404 Swimming Pool Permit-Engineering 15.00 15.00 <br /> 405 Water Connection Permit Fee-Community Develop: <br /> 406 Residential 96.00 96.00 <br /> 407 Commercial 303.00 303.00 <br /> 408 Repair 61.00 61.00 <br /> 409 Disconnect:residential 85.00 85.00 <br /> 410 Disconnect: commercial 169.00 169.00 <br /> 411 Water Connection/Inspection Permit Fee-Engineering: <br /> 412 Connection:residential 25.00 25.00 <br /> 413 Connection: commercial 75.00 75.00 <br /> 414 Connection:repair 25.00 25.00 <br /> 415 Connection: inspection 75.00 75.00 <br /> 416 Disconnect: residential 25.00 25.00 <br /> 417 Disconnect: commercial 75.00 75.00 <br /> 418 Water Meter Program Fees-Engineering: <br /> 419 Manual meter read surcharge 40.00 20.00 per quarter <br /> 420 Non-standard water meter no-read fee 50.00 50.00 <br /> 421 Denial of access to water meter 100.00 100.00 per quarter <br /> 15 <br />