Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: July 24, 2018 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2018 Pavement Management Project <br />o Council awarded this year's project to T.A. Schifsky and Sons. Work consists of <br />replacing 1 mile of water main and 6 miles of pavement resurfacing. <br />• Work is approximately 60% completed and is anticipated to be done by <br />early September. <br />• Water Booster Station Phase 2 <br />Bids were opened on July 17. The low best value bid was 14.5% under estimate <br />and is scheduled to be awarded on July 23 by Council. <br />Work will begin this fall and continue through summer of 2019. <br />Work includes HVAC upgrades, electrical upgrades including creation of an <br />electrical room, security upgrades, replacement of two pumps and replacement of <br />some underground piping and valves. <br />• 2018 Sewer CIPP <br />o This year's project involves lining 6.0 miles of sanitary sewer pipe and two small <br />segments of storm sewer. Veit & Companies was awarded the project in <br />November. This project is approximately 50% complete with the project <br />scheduled to be completed by the end of September. <br />• Lounge Lift Station <br />o This sanitary sewer lift station will be rehabbed with new pumps, controls and a <br />new force main. Work began this week and will continue for the next month. <br />• Fernwood Lift Station <br />o The City's consultant is performing a feasibility study on different options to <br />rehabilitate this lift station. Based on the outcome of the feasibility report plans <br />and specifications will be completed later this summer for construction next year. <br />• ADA Inventory <br />o Engineering staff is currently measuring and inventorying all City owned curb <br />ramps (419) to make sure they are in ADA compliance to include in our ADA <br />Transition Plan. <br />