My WebLink
|
Help
|
About
|
Sign Out
Home
2018_07-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_07-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 11:02:17 AM
Creation date
7/25/2018 10:52:54 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/24/2018
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Item 4: Communications Items <br />Metropolitan Council Environmental Services updates: <br />• Avon street <br />o This project is just beginning with preliminary site work. Work consists of <br />replacing a section of sewer main, installing a new meter pit, and CIPP lining the <br />rest of the sewer main pipe. Work on this site is scheduled to be substantially <br />completed by the end of October 2018. <br />• Upper Villa <br />o Project is underway with the temporary bypass being installed. Work in Upper <br />Villa will begin next week. Work consists of installing two new manholes and <br />CIPP lining the sewer main. Work on this site is scheduled to be substantially <br />completed by the end of October 2018. <br />County Road 88 & Long Lake Road <br />o Project is scheduled to begin in February of 2019. Works consists of CIPP lining <br />the sewer main. Work on this site is scheduled to be substantially completed by <br />the end of November 2019. <br />Ramsey County: <br />• Lexington Avenue Resurfacing <br />o The County is performing a mill and overlay of Lexington Avenue between Como <br />Avenue in St Paul to TH 36 in Roseville. Curb ramps and storm sewer repairs are <br />currently ongoing. Milling and paving will begin in the next few weeks. The <br />majority of the major work is completed. The contractor will be installing ground <br />in pavement markings later this month. <br />• County Road C Reconstruction <br />o The County will be reconstructing County Road C between Highway 88 in St <br />Anthony and Long Lake in Roseville in 2019. In addition to the pavement <br />reconstruction and signal light replacements, a pathway will be installed on the <br />south side of County Road C. More information will be presented when the <br />project is further developed. <br />Minnesota Department of Transportation updates: <br />• MnDOT's 35W resurfacing project between 4u' St SE in Minneapolis to County Road C <br />in Roseville is underway. Major work and road closures will occur on/off peak hours <br />including five weekend closures. Additionally the signal light at County Road B and <br />Cleveland Avenue will be replaced with this project. Work is anticipated to be completed <br />in October. <br />
The URL can be used to link to this page
Your browser does not support the video tag.